WaterFurnace introduces waterside economizer option to its commercial product line


WaterFurnace International, Inc., the leading manufacturer of geothermal and water source heat pumps, introduces a waterside economizer option to its commercial product line. Available on 2-6 ton horizontal and vertical Versatec Base, Versatec Ultra Envision2 Compact and 7-25 ton horizontal and vertical Envision XL products, this new option allows the use of a building’s interior loop water to provide “free” cooling.

The waterside economizer works by passing air through an internal coil cooled by loop water rather than by mechanical refrigeration. The unit contains a water-to-air heat exchanger, a three-way valve and controls that manage the flow of water through the heat exchanger. When cooling is required and the building loop water temperature is below the economizer setpoint, which is typically 45° F, water passes through the economizer. Air is drawn through the cool economizer and the heat pump’s compressor is turned off. Cooling is then provided by the economizer, reducing energy use. Compressor life is extended as a result of reduced run hours and less cycling.

“Depending on design conditions, economizers can provide up to 100 percent of cooling load requirements in a building,” said Tim Litton, director of marketing communications, WaterFurnace International, Inc. “This makes cooling much more energy efficient and translates to significant energy savings for the building owner.”

Because they are not directly subject to outdoor air conditions, waterside economizers provide longer operating hours and better humidity control than airside economizers. They also have fewer mechanical components and are less prone to failure.

Water source heat pumps that use the waterside economizer option can be operated in a standalone configuration or via network DDC control.

To learn more about WaterFurnace, visit www.waterfurnace.com.

 



July 31, 2015


Topic Area: Press Release


Recent Posts

UCI Health Set to Open First All-Electric Hospital

All-electric acute care hospital aims to help University of California’s goal of reducing 90 percent of total carbon emissions by 2045.


Ground Broken on Baptist Health Sunrise Hospital

The planned seven-story, 340,000-square-foot facility is expected to open to patients in 2029.


Rapid City Medical Center to Join Monument Health

The parties will perform further due diligence with the intention to sign definitive agreements and close on the transaction later this spring.


AI Adoption on the Rise Among Leaders

AI usage increased in all markets in the fourth quarter of 2025.


TriasMD Officially Opens DISC Surgery Center at Tarzana

At 10,930 square feet, DISC Surgery Center at Tarzana includes three high-technology operating rooms and 11 patient care bays.


 
 


FREE Newsletter Signup Form

News & Updates | Webcast Alerts
Building Technologies | & More!

 
 
 


All fields are required. This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

 
 
 
 

Healthcare Facilities Today membership includes free email newsletters from our facility-industry brands.

Facebook   Twitter   LinkedIn   Posts

Copyright © 2023 TradePress. All rights reserved.