York Dedicated Outdoor Air System from Johnson Controls meets fresh air requirements


Johnson Controls rounds out its line of HVAC products with a new Dedicated Outdoor Air System (DOAS). The York DOAS meets ASHRAE 62.1 fresh air requirements, delivering up to 100 percent clean, dehumidified outside air in all weather and climate conditions. The system also meets customer comfort requirements with precise control through modulating heating and cooling capacities.

The York DOAS is fully configurable, with more factory-installed options than any other unit, making it easy to install and use. Its robust construction, including foam panel double-wall construction, R13 insulation value, renewable/organic insulation material, safe bottom lifting, pre-painted G90 galvanized steel and hinged and lockable doors, allows for reliable performance and longevity.

A direct drive plenum fan is at the heart of the York DOAS, and an energy recovery module pre-conditions fresh air by using energy from the exhaust air. The system also features:

Stainless steel heat exchangers

MERV 8 and MERV 13 filters

Independent modulating reheat circuit

Variable frequency drive supply fan control

ECM condenser fans

Additionally, the DOAS advanced control system is intuitive, user friendly and designed to be integrated with building automation systems.

For more information, visit www.johnsoncontrols.com/be.



November 19, 2015


Topic Area: Press Release


Recent Posts

IAQ and Infection Mitigation: Plans Into Actions

To support quality patient care and ensure compliance, managers must stay ahead of environmental and IAQ risks.


Case Study: How NYU Langone Rebuilt for Resilience After Superstorm Sandy

Although the damage was severe, it provided a valuable opportunity for NYU Langone to assess structural vulnerabilities and increase facility resilience.


Dayton Children's Hospital Announces New Rehabilitative Services Building

The new location will feature convenient surface parking, outdoor space to aid in healing and a single-level layout.


The Debate on Laundering Microfibers in Healthcare

Should microfibers be single-use or reusable? Researchers have opinions on both.


Construction Begins for New Cancer Center at OhioHealth's Administrative Campus

The project’s completion date is estimated for late 2028.


 
 


FREE Newsletter Signup Form

News & Updates | Webcast Alerts
Building Technologies | & More!

 
 
 


All fields are required. This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.