York Dedicated Outdoor Air System from Johnson Controls meets fresh air requirements


Johnson Controls rounds out its line of HVAC products with a new Dedicated Outdoor Air System (DOAS). The York DOAS meets ASHRAE 62.1 fresh air requirements, delivering up to 100 percent clean, dehumidified outside air in all weather and climate conditions. The system also meets customer comfort requirements with precise control through modulating heating and cooling capacities.

The York DOAS is fully configurable, with more factory-installed options than any other unit, making it easy to install and use. Its robust construction, including foam panel double-wall construction, R13 insulation value, renewable/organic insulation material, safe bottom lifting, pre-painted G90 galvanized steel and hinged and lockable doors, allows for reliable performance and longevity.

A direct drive plenum fan is at the heart of the York DOAS, and an energy recovery module pre-conditions fresh air by using energy from the exhaust air. The system also features:

Stainless steel heat exchangers

MERV 8 and MERV 13 filters

Independent modulating reheat circuit

Variable frequency drive supply fan control

ECM condenser fans

Additionally, the DOAS advanced control system is intuitive, user friendly and designed to be integrated with building automation systems.

For more information, visit www.johnsoncontrols.com/be.



November 19, 2015


Topic Area: Press Release


Recent Posts

5 Reasons Engineering is the Edge in Healthcare Master Planning

The most successful plans go further to unlock smarter investments, improve resilience and enable better patient outcomes.


Building an AI-Ready Healthcare Facility 

Creating a secure, standardized data foundation can help facilities teams put AI to work more effectively.


Family Medical Associates of Raleigh Reports April 2026 Data Breach

The investigation has found evidence that between April 18, 2026, and April 20, 2026, an unauthorized actor intermittently accessed some FMAR systems.


Every Detail Matters: A Patient's Story of Healing, Hope and Healthcare Facilities

In the Facilities in Focus season finale, 11-year-old Kendalynn and her mother share how Intermountain Primary Children’s Hospital became more than a place for care.


Geisinger Wyoming Valley Medical Center Tops Off New 11-Story Tower

The expansion will improve the patient experience by transitioning the hospital to all private patient rooms while significantly increasing clinical capacity.


 
 


FREE Newsletter Signup Form

News & Updates | Webcast Alerts
Building Technologies | & More!

 
 
 


All fields are required. This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.