Zurn Wilkins unveils new stainless steel large diameter backflow preventer

By Healthcare Facilities Today


ERIE, PA – Zurn Industries, LLC introduces the Zurn Wilkins 300AST Stainless Steel Large Diameter Backflow Preventer–lightweight, corrosion resistant, and easier to install in small spaces. This new backflow preventer can be used in most existing low-pressure systems without the need to acquire a pump.

 The Zurn Wilkins 300AST Stainless Steel Large Diameter Backflow Preventer offers customers these additional features: a machined check positioning sleeve, eliminating weld-seam leaks; checks that are retained securely, providing stable pressures with faster test results; a flow clean sensing passage to eliminate debris build-up in the sensing line: and, as with the entire Zurn Wilkins 300AST series, a short lay-length that allows for installation into smaller spaces, and easy replacement of any backflow brand.

 "The new Zurn Wilikins 300AST is suitable for a number of different uses including fire protection," says Rick Fields, Senior Director of Marketing and Product Development for Zurn Wilkins.

 Zurn is launching the new Stainless Steel Large Diameter Backflow Preventer in two stages: first in sizes 2 ½” to 6” and then 8” and 10” in the near future. It is available in four functional categories: Double Check Assembly; Reduced Pressure Assembly; Double Check Detector Assembly; and Reduced Pressure Detector Assembly. The 300AST series has received full approval from the Foundation for Cross Connection Control and Hydraulic Research at the University of Southern California (USC Foundation).

 

About Zurn Industries

Zurn Industries, LLC is a recognized leader in commercial, municipal, and industrial markets.  Zurn manufactures the largest breadth of engineered water solutions in the industry, including a wide spectrum of sustainable plumbing products. Zurn delivers total building solutions for new construction and retrofit applications that enhance any building’s environment. For more information, visit www.zurn.com

 



September 4, 2013


Topic Area: Press Release


Recent Posts

Backup Power Is a Lifeline: What Healthcare Facility Managers Must Get Right

From compliance and patient safety to community resilience, facility managers must prioritize preventive maintenance, training and technology to ensure uninterrupted power.


3 Pillars of Stronger Cybersecurity in Healthcare

These strategies can help healthcare facilities stay ahead of evolving cyber threats.


Piedmont Fayette Hospital to Build New Patient Tower

The renovation and expansion project will extend to other areas of the hospital, including surgical services, kitchen, lab, pharmacy and more.


Texas HHSC Announces Construction of New Lubbock Psychiatric Center

The hospital is designed with the latest mental healthcare standards in mind to promote recovery and healing.


Armed Standoff at West Virginia Hospital Reminds of the Need for Safety Measures

The alleged suspect, who's now in custody, was also linked to earlier bomb threats.


 
 


FREE Newsletter Signup Form

News & Updates | Webcast Alerts
Building Technologies | & More!

 
 
 


All fields are required. This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.