Skender’s Healthcare Portfolio Growing as Firm Completes Several Projects for Major Chicago Health System


Skender’s healthcare team has won construction management assignments for several projects throughout Chicago. Among the projects recently started or nearing completion:

• NM Immediate Care Clinic (West Loop, Chicago) – 5,500-SF build-out in new core and shell building at 171 N. Aberdeen featuring six exam rooms, an x-ray room, infusion treatment areas, laboratory space, staff lounge and work areas, and an internal mechanical room with a standalone air handling unit.

• NM Lavin Pavilion 21st Floor Internal Medicine Clinic (Streeterville, Chicago) – 15,000-SF build-out in core and shell building on Northwestern Medicine’s Streeterville Campus featuring 25 exam rooms, staff offices and lounge area, laboratory space, and various support spaces. The project was completed on an expedited timeframe and utilized extensive building information modeling (BIM).

• NM Galter 1 Renovations (Streeterville, Chicago) – Upgrades to the existing Galter Pavilion 1st Floor Lobby including seating areas featuring new terrazzo, lighting and upgraded finishes. The project was completed in multiple phases with no impact to hospital operations.

• Prentice Operating Room Video Integration (Streeterville, Chicago) – Interior upgrades to 10 Operating Rooms and supporting services within Prentice Women’s Hospital. The upgrade consisted of finishes, millwork, terrazzo flooring, OR booms and lights with structure, and video integration systems with associated electrical work. Extensive coordination with the Owner’s equipment vendors involved to provide the complete electrical infrastructure for the new systems. This project involved refreshing of an old OR suite for temp use and moving the entire OR operations to the temp space prior to the start of construction.

Skender’s team has successfully completed renovation and new construction work for other healthcare clients with a strong Midwest presence, including Ann & Robert H. Lurie Children's Hospital of Chicago, Esperanza Health Centers, University of Chicago Medicine, Rush University Medical Center and Loyola Medicine.

For more information on Skender, visit www.skender.com.



September 19, 2018


Topic Area: Press Release


Recent Posts

Respecting EVS Workers: 19 Minutes Is Not Enough

The infection control problem is time, and it's up to facility managers, EVS directors and infection preventionists to address the problem.


Where are the Greenhouse Gas Emissions Hotspots in Healthcare?

First-year findings from Boston Medical Center show medical waste generates a disproportionate amount of healthcare emissions.


Caravel Autism Health Opens Clinic in Lake Zurich, Illinois

The clinic features colorful, sensory-friendly spaces where children work one-on-one with therapists.


The Future of Healthcare Facility Construction Projects

Brian Cowperthwaite highlights the invisible work that impacts everyone who walks through a healthcare facility.


Ground Broken on Jupiter Medical Center's Second Hospital

The 53,000-square-foot hospital will include 29 inpatient beds, four operating rooms, 24-hour emergency services, a diagnostic laboratory and imaging services.


 
 


FREE Newsletter Signup Form

News & Updates | Webcast Alerts
Building Technologies | & More!

 
 
 


All fields are required. This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

 
 
 
 

Healthcare Facilities Today membership includes free email newsletters from our facility-industry brands.

Facebook   Twitter   LinkedIn   Posts

Copyright © 2023 TradePress. All rights reserved.