Engineering - November 2015
Cardiovascular facility built with complex smoke-control system
Atrium size and building code required a large amount of outdoor air to be supplied to the atrium built with complex smoke-control system
11/30/2015

Industrial engineer may be new voice at the design table
The function of the continuous improvement specialist is to oust the sacred cows of custom and habit, according to an article on the Health Design website
11/25/2015

Fifth Pa. patient death linked to bacteria in water
In all cases, the hospitals used a "heater-cooler" device to control the patients' body temperatures while they were on a heart-bypass machine
11/17/2015

Display By Date
NEW