Engineering - November 2015

Cardiovascular facility built with complex smoke-control system

Atrium size and building code required a large amount of outdoor air to be supplied to the atrium built with complex smoke-control system

11/30/2015



Industrial engineer may be new voice at the design table

The function of the continuous improvement specialist is to oust the sacred cows of custom and habit, according to an article on the Health Design website

11/25/2015



Fifth Pa. patient death linked to bacteria in water

In all cases, the hospitals used a "heater-cooler" device to control the patients' body temperatures while they were on a heart-bypass machine

11/17/2015



 
 
 


FREE Newsletter Signup Form

News & Updates | Webcast Alerts
Building Technologies | & More!

 
 
 


All fields are required. This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

 
 
 
 

Healthcare Facilities Today membership includes free email newsletters from our facility-industry brands.

Facebook   Twitter   LinkedIn   Posts

Copyright © 2023 TradePress. All rights reserved.