Cardiovascular facility built with complex smoke-control system

Atrium size and building code required a large amount of outdoor air to be supplied to the atrium built with complex smoke-control system


The atrium size and building code of a cardiovascular facility in a northern climate required a large amount of outdoor air (OA) to be supplied to the atrium, according to an article on the Consulting- Specifying Engineer website.

The five-level, 400,000-square-foot cardiovascular center had tight site constraints and connections to adjacent buildings. This created the need for planning that placed the building air-handling units and fans on level five in a two-level mechanical room, with supply and return ductwork routed vertically in chases to the levels below, the article said. 

Building pressurization and ventilation were satisfied through the make-up air requirements with the HVAC design incorporating two OA-pretreat units. 

An additional function of these units was to provide treated make-up air to the atrium in locations and at velocities that met code requirements related to a potential fire origin in the atrium. 

Read the article.

 

 



November 30, 2015



Recent Posts

Containing Candida Auris Across the Care Continuum

Containment becomes achievable, sustainable and far more effective for facilities that follow the same precautions, disinfectant standards and equipment rules.


Early Entry: Manager's Critical Role in Construction Planning

Facilities managers should seek a seat at the table early to shape decisions that affect operations and continuity of care from the onset.


OhioHealth Van Wert Hospital Earns Critical Access Hospital Designation

The program was established to help rural hospitals maintain local access to care by providing additional flexibility through a cost-based Medicare reimbursement model.


Designing a Home Away from Home

Ronald McDonald House Atlanta balances the familiarity of home with the demands of a high-use facility serving families of children receiving medical care.


Stephens County Hospital Becoming Part of Wellstar Health System

The transaction is expected to be completed toward the end of 2026, pending the conclusion of regulatory approvals.


 
 


FREE Newsletter Signup Form

News & Updates | Webcast Alerts
Building Technologies | & More!

 
 
 


All fields are required. This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

 
 
 
 

Healthcare Facilities Today membership includes free email newsletters from our facility-industry brands.

Facebook   Twitter   LinkedIn   Posts

Copyright © 2023 TradePress. All rights reserved.