Armstrong Fluid Technology introduces its new E Series pump-less volute kit


Armstrong Fluid Technology has announced the introduction of its E.2 Pump-Less Volute (PLV) kit which is designed to upgrade, renew or replace all working parts of all models in the E Series family of circulators. The kits are suitable for both hydronic fluid and potable water applications and include all the new features that were introduced with the second generation of the E Series.

The E.2 Series are energy-efficient, Dry Motor circulators designed for a wide range of applications. They include a permanently lubricated mechanical seal that can be replaced quickly and easily. Featuring improved durability and enhanced protection against leakage and water damage to electrical components, the key design elements of the E.2 Series include:

• New water slinger to protect motor against water intrusion

• Larger, stainless steel shaft

• Sealed, permanently lubricated bearings

• Bellows-style mechanical seal with silicon carbide wear surfaces

The energy-efficient dry motor design and hydraulics of the E.2 Series circulator is rated higher than many other fixed speed circulators in its class, and the wire-to-water efficiency provides more energy savings for building owners.  The compact size of the E.2 Series circulators, with minimized flange-to-flange dimensions, makes installation easy and also allows contractors to complete an installation without making changes to existing piping.

Because the new E.2 PLV Kits are also compatible with the original E series, it is now possible to upgrade the older series to the latest E.2 Series technology.

 



May 6, 2015


Topic Area: Press Release


Recent Posts

How Efficiency Checklists Help Hospitals Save Energy, Water and Money

Keith Edgerton explains how a simple, systematic tool can help healthcare facilities identify savings, support sustainability goals and reinvest in long-term decarbonization.


Designing with Heart: Seen Health Center Blends Cultural Warmth and Clinical Care

Case study: The Alhambra-based facility uses Wilsonart Woodgrains to create a space where comfort, tradition and durability come together for an elevated senior care experience.


Rutgers Health and University Hospital Breaks Ground on Campus Expansion

The groundbreaking follows the long-awaited demolition of administrative offices built in the 1970s.


What to Consider When Modernizing Healthcare Facilities

While there has been a call to preserve old buildings, healthcare facilities need to weigh the options of patient care.


Corewell Health Beaumont Troy Hospital to Build New Tower

The tower is expected to be completed in 2030.


 
 


FREE Newsletter Signup Form

News & Updates | Webcast Alerts
Building Technologies | & More!

 
 
 


All fields are required. This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

 
 
 
 

Healthcare Facilities Today membership includes free email newsletters from our facility-industry brands.

Facebook   Twitter   LinkedIn   Posts

Copyright © 2023 TradePress. All rights reserved.