Armstrong Fluid Technology introduces its new E Series pump-less volute kit


Armstrong Fluid Technology has announced the introduction of its E.2 Pump-Less Volute (PLV) kit which is designed to upgrade, renew or replace all working parts of all models in the E Series family of circulators. The kits are suitable for both hydronic fluid and potable water applications and include all the new features that were introduced with the second generation of the E Series.

The E.2 Series are energy-efficient, Dry Motor circulators designed for a wide range of applications. They include a permanently lubricated mechanical seal that can be replaced quickly and easily. Featuring improved durability and enhanced protection against leakage and water damage to electrical components, the key design elements of the E.2 Series include:

• New water slinger to protect motor against water intrusion

• Larger, stainless steel shaft

• Sealed, permanently lubricated bearings

• Bellows-style mechanical seal with silicon carbide wear surfaces

The energy-efficient dry motor design and hydraulics of the E.2 Series circulator is rated higher than many other fixed speed circulators in its class, and the wire-to-water efficiency provides more energy savings for building owners.  The compact size of the E.2 Series circulators, with minimized flange-to-flange dimensions, makes installation easy and also allows contractors to complete an installation without making changes to existing piping.

Because the new E.2 PLV Kits are also compatible with the original E series, it is now possible to upgrade the older series to the latest E.2 Series technology.

 



May 6, 2015


Topic Area: Press Release


Recent Posts

Streamlined Integrated Project Delivery Tackles Design Challenges

Successful implementation of IPD Light can improve patient care, project outcomes and bottom lines.


Encompass Health Rehabilitation Hospital of Central Florida - Sumter County Opens

It is a satellite location of Encompass Health Rehabilitation Hospital of Central Florida.


Rudolph and Sletten Awarded $960M for New UCSF Benioff Children's Hospital

Construction work is expected to commence in September 2025 with substantial completion anticipated in 2031.


How Designers Create Welcoming Senior Care Communities

Risk assessments and cost analysis play a role in creating thriving communities.


Data-Driven Decisions: How Analytics Are Shaping Healthcare Facility Planning

Hospitals can use data to prioritize upgrades, extend building lifespans and maximize the impact of limited capital budgets.


 
 


FREE Newsletter Signup Form

News & Updates | Webcast Alerts
Building Technologies | & More!

 
 
 


All fields are required. This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

 
 
 
 

Healthcare Facilities Today membership includes free email newsletters from our facility-industry brands.

Facebook   Twitter   LinkedIn   Posts

Copyright © 2023 TradePress. All rights reserved.