Focus: Fire-Life Safety / Column

Regulations, Codes & Standards Q&A: Eye-wash station tests

Brad Keyes discusses regulations for annual eye-wash station tests

By Brad Keyes / Special to Healthcare Facilities Today


Q:  Is there a requirement to test eyewash stations annually? We do a weekly test for various items but are we required to conduct an annual test as well? 

A: Yes… ANSI Z358.1-2014 section 5.5.5 says all eyewashes shall be inspected annually to assure conformance with Section 5.4 requirements of this standard.

Section 5.4 says it is the owner’s responsibility to ensure that eyewashes shall:

• Be assembled and installed in accordance with the manufacturer's instructions, including flushing fluid delivery requirements.

• Be in accessible locations that require no more than 10 seconds to reach. The eyewash shall be located on the same level as the hazard and the path of travel shall be free of obstructions that may inhibit its immediate use.

• Be located in an area identified with a highly visible sign positioned so the sign shall be visible within the area served by the eyewash. The area around the eyewash shall be well-lit.

• Be arranged such that the flushing fluid flow pattern as described in Section 5.1.8 is not less than 33 inches and no greater than 53 inches from the surface on which the user stands and 6 inches minimum from the wall or the nearest obstruction.

• Be connected to a supply of flushing fluid per the manufacturer’s installation instructions to produce the required spray pattern for a minimum period of 15 minutes. Where the possibility of freezing conditions exists, the eyewash shall be protected from freezing or freeze-protected equipment shall be installed. If shut off valves are installed in the supply line for maintenance purposes, provisions shall be made to prevent unauthorized shut off.

• Deliver tepid flushing fluid. In circumstances where chemical reaction is accelerated by flushing fluid temperature, a facilities safety/health advisor should be consulted for the optimum temperature for each application.

• When the plumbed eyewash is installed, its performance shall be verified in accordance with the following procedures:

• • With the unit correctly connected to the flushing fluid source and the valve(s) closed, visually check the piping connections for leaks.

• • Open the valve to the full open position. The valve shall remain open without requiring further use of the operator's hands.

• • With the valve in the fully open position, make sure that both eyes will be washed simultaneously at a velocity low enough to be non-injurious to the user.

• • Using the flowmeter or other means, determine that the rate of flow is at least 0.4 gpm.

• • Using a temperature gauge or other means, determine that the flushing fluid is tepid.

• When the self-contained eyewash is installed, its installation shall be verified in accordance with manufacturer’s instructions.

Brad Keyes, CHSP, is the owner of KEYES Life Safety Compliance, and his expertise is in the management of the Life Safety Program, including the Environment of Care and Emergency Management programs.

 

 



November 7, 2018


Topic Area: Safety


Recent Posts

Case Study: How NYU Langone Rebuilt for Resilience After Superstorm Sandy

Although the damage was severe, it provided a valuable opportunity for NYU Langone to assess structural vulnerabilities and increase facility resilience.


Frederick Health Hospital Faces 5 Lawsuits Following Ransomware Attack

The lawsuits accuse FHH of inadequate cybersecurity, poor breach notification and failing to protect patients from identity theft risks.


Arkansas Methodist Medical Center and Baptist Memorial Health Care to Merge

They have signed a non-binding letter of intent to complete a shared mission agreement to merge the two organizations.


Ground Broken on Intermountain Saratoga Springs Multi-Specialty Clinic

The clinic is scheduled to open and start seeing patients in the fall of 2026.


Electrical Fire Tests Resilience of Massachusetts Hospital

Signature Healthcare Brockton Hospital used opportunity to renovate key systems and components and expand facility operations.


 
 


FREE Newsletter Signup Form

News & Updates | Webcast Alerts
Building Technologies | & More!

 
 
 


All fields are required. This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.