Mortensen Construction

Sanford Fargo Medical Center to get new lobby, patient rooms

The lobby will cover 4,000 square feet and will rise to 44 feet at the highest point


Sanford Fargo Medical Center (N.D.) main lobby area and patient room designs are complete, according to an article on the Medical Construction & Design website. The interior changes are part of new $494 million facility.

The lobby will cover 4,000 square feet and will rise to 44 feet at the highest point, the article said. The multilevel lobby will have public seating on the first floor and surgery waiting areas on the second and third floors.

The south facing lobby will include large windows for natural light.

“Natural light can be such a powerful tool in the healing process and in promoting positive well-being of patients, staff and guests. We optimized the size and placement of the windows in the lobby’s design to allow for maximum light,” Paul Richard, Sanford Medical Center Fargo president, said in the article.

The patient rooms are designed to adapt to changing services over time if needed. 

“We chose soothing paint colors in each patient room,” said Richard. “We also wanted to have a unique and local design to the rooms, so native North Dakota flower graphics will be incorporated.”

Read the article.

 

 



August 21, 2014


Topic Area: Interior Design


Recent Posts

Case Study: How NYU Langone Rebuilt for Resilience After Superstorm Sandy

Although the damage was severe, it provided a valuable opportunity for NYU Langone to assess structural vulnerabilities and increase facility resilience.


Frederick Health Hospital Faces 5 Lawsuits Following Ransomware Attack

The lawsuits accuse FHH of inadequate cybersecurity, poor breach notification and failing to protect patients from identity theft risks.


Arkansas Methodist Medical Center and Baptist Memorial Health Care to Merge

They have signed a non-binding letter of intent to complete a shared mission agreement to merge the two organizations.


Ground Broken on Intermountain Saratoga Springs Multi-Specialty Clinic

The clinic is scheduled to open and start seeing patients in the fall of 2026.


Electrical Fire Tests Resilience of Massachusetts Hospital

Signature Healthcare Brockton Hospital used opportunity to renovate key systems and components and expand facility operations.


 
 


FREE Newsletter Signup Form

News & Updates | Webcast Alerts
Building Technologies | & More!

 
 
 


All fields are required. This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.