Wattstopper Digital Lighting Management Helps USGBC Meet Its Own Highest LEED Standards


The U.S. Green Building Council (USGBC) headquarters in Washington, D.C. is more than just an office building. It serves as a living lab and a testament to the organization’s commitment to its own LEED standards. So when the USGBC team sought out a lighting and plug load controls solution to help it stay within the rigorous LEED Platinum standard, it turned to Legrand.

USGBC selected Legrand’s Wattstopper Digital Lighting Management (DLM) system to ensure it would improve energy efficiency and meet their needs. Wattstopper DLM offered an innovative and occupant-centric approach to lighting and plug load controls. It is an intelligent, distributed control system that automatically maximizes lighting levels and energy efficiency throughout a building.

“The DLM system offered the best opportunity to meet our energy efficiency and sustainability goals,” said Melanie Mayo-Rodgers, USGBC Facility Manager. “It allows for flexibility, offers reliability, lighting control efficiency and is sensor driven based on occupancy to lower electrical consumption and achieve additional energy savings.”

Among the benefits the headquarters saw were a 34 percent reduction in energy use in the first year.  Real time collection and analysis of data allows USGBC to quickly address areas where energy efficiency requires improvement. It also enables remote troubleshooting through flexible digital components that can be programmed via computer, handheld wireless programmers, or at the device level.

The system provides USGBC with the ability to schedule specific shutdown schedules in areas of the office that do not have sensors. This allows users to reduce energy waste when spaces are not being utilized. Integration with the building management system allows occupancy sensors to maximize energy savings by controlling heating and cooling in vacant spaces.

 



November 16, 2017


Topic Area: Press Release


Recent Posts

State of the Facilities Management Industry in 2025

Many facility managers cite budget constraints and the rise in operating concerns as their top concerns heading into the new year.


City of Hope to Open New Cancer Specialty Hospital in California

This 72-acre academic research campus offers patients access to the full continuum of advanced cancer care.


Montefiore Einstein Opening New Inpatient Center for Youth in the Bronx

New 21-bed inpatient pediatric mental health center adds critical care beds to address behavioral and mental health needs in the Bronx, nearly doubling inpatient capacity.


Skill Stacking: How Micro-Credentials Are Reshaping Trades

Micro-credentials can keep skilled trade workers up to speed with modern systems and complement longer, more formal training programs.


Prima Medicine Opens New Location in Tysons, Virginia

The Tysons location becomes Prima Medicine's fifth practice in the Washington metropolitan area.


 
 


FREE Newsletter Signup Form

News & Updates | Webcast Alerts
Building Technologies | & More!

 
 
 


All fields are required. This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.