Wattstopper Digital Lighting Management Helps USGBC Meet Its Own Highest LEED Standards


The U.S. Green Building Council (USGBC) headquarters in Washington, D.C. is more than just an office building. It serves as a living lab and a testament to the organization’s commitment to its own LEED standards. So when the USGBC team sought out a lighting and plug load controls solution to help it stay within the rigorous LEED Platinum standard, it turned to Legrand.

USGBC selected Legrand’s Wattstopper Digital Lighting Management (DLM) system to ensure it would improve energy efficiency and meet their needs. Wattstopper DLM offered an innovative and occupant-centric approach to lighting and plug load controls. It is an intelligent, distributed control system that automatically maximizes lighting levels and energy efficiency throughout a building.

“The DLM system offered the best opportunity to meet our energy efficiency and sustainability goals,” said Melanie Mayo-Rodgers, USGBC Facility Manager. “It allows for flexibility, offers reliability, lighting control efficiency and is sensor driven based on occupancy to lower electrical consumption and achieve additional energy savings.”

Among the benefits the headquarters saw were a 34 percent reduction in energy use in the first year.  Real time collection and analysis of data allows USGBC to quickly address areas where energy efficiency requires improvement. It also enables remote troubleshooting through flexible digital components that can be programmed via computer, handheld wireless programmers, or at the device level.

The system provides USGBC with the ability to schedule specific shutdown schedules in areas of the office that do not have sensors. This allows users to reduce energy waste when spaces are not being utilized. Integration with the building management system allows occupancy sensors to maximize energy savings by controlling heating and cooling in vacant spaces.

 



November 16, 2017


Topic Area: Press Release


Recent Posts

Making Multi-Site Lighting Upgrades Work

Success requires a program structure that connects audits, financial analysis, rebate administration, procurement, scheduling and closeout documentation.


Designing a Positive Care Destination for Children

The new Mary Bridge Children’s Hospital reimagines the healthcare experience to create an environment that feels welcoming from arrival to discharge.


Blackbird Health Opens 10th Clinic in Pennsylvania

The Bala Cynwyd clinic represents Blackbird Health's 13th location overall.


Healthcare Construction Infection Control: Essential CDC Guidelines for Active Facilities

Construction and renovations happen, but that doesn’t mean infection prevention can take a backseat. The CDC has some recommendations for maintaining best practices during construction.


Protecting the Most Vulnerable: Inside the NICU

SSM Health St. Mary’s Hospital leaders share how maintaining power, air quality and essential systems helps protect patients during their most vulnerable moments.


 
 


FREE Newsletter Signup Form

News & Updates | Webcast Alerts
Building Technologies | & More!

 
 
 


All fields are required. This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.