$1.5 billion Philadelphia healthcare pavilion project using lean practices, offsite fabrication

July 19, 2019

The University of Pennsylvania's $1.5 billion medical pavilion project in Philadelphia is being managed with lean methods that rely on relationships, shared knowledge and common goals, according to an article on the Construction Dive website. 

The 1.5 million-square-foot Penn Medicine Pavilion will include 500 private rooms, an inpatient care unit for heart and vascular patients, neurology and neurosurgery units, a cancer center and an emergency department. 

The project is using prefabrication for time-intensive construction like mechanical, plumbing and drywall work. 

Five-hundred-and-fifty-nine mechanical racks, 504 bathroom pods and 47 zone valve boxes for medical gas are being constructed in a warehouse two miles away from the building site.

Read the article.

See the latest posts on our homepage


Share

Topic Area: Project Management


Recent Posts
Recent Posts

C. difficile strain evolving to live in hospital rooms


A subset of Clostridium difficile bacteria is on the verge of becoming a new species

8/23/2019

Tips for energy efficient healthcare facilities


Improving energy efficiency can be done in a few minutes a day

8/23/2019

Security catches woman trying to kidnap toddler from N.Y. hospital


The suspect allegedly took a stroller with a two-year-old inside and fled St. Joseph’s Hospital

8/23/2019

Rhode Island hospital employees to get panic buttons


Contract with Our Lady of Fatima Hospital addresses concerns around safety

8/23/2019

Maintaining sidewalks and parking garages requires a comprehensive, strategic approach


By developing inspection guidelines for common causes of problems, managers can extend the performance life of concrete components

8/23/2019





Post Comment




FREE
NEWSLETTER

News & Updates • Webcast Alerts • Building Technologies

All fields are required.

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.