AJ Manufacturing Introduces Portable Air Filtration Units for Creating COVID-19 Patient Isolation Rooms


AJ Manufacturing, a leading manufacturer of critical environment HVAC products, has introduced a portable version of its Reverse Flow Criti-Clean Ultra™ Fan Filter Unit (FFU) to quickly and easily create patient isolation rooms. The new units were specifically developed to help protect healthcare workers treating COVID-19 patients and to help reduce the spread of the virus.
 
Like the original ceiling-mounted model, the portable Reverse Flow Criti-Clean Ultra™ FFU connects to existing ductwork and creates a negative pressure environment that removes the air from a patient room and cleans it via the unit’s built-in HEPA filter, keeping airborne contaminants from escaping. The unit comes on wheels for easy movement and can be plugged into a standard electrical wall outlet.
 
“We’re proud to be able to do our small part to help protect healthcare workers who are treating the growing number of coronavirus patients,” said Rob Haake, president of AJ Manufacturing. “Our plant is 100% focused on producing both our permanent and portable FFU models for as long as they are needed to help stop the spread of the virus.”
 
In addition to reverse flow units that take in air and remove it from a room, standard FFU models – both ceiling mounted and portable – are also available to bring HEPA filtered air into a room. AJ’s ceiling mounted FFUs offer the industry’s lowest plenum height of just 13.7″, allowing easier retrofitting into existing ceiling spaces.

For more information, contact AJ Manufacturing at 816-231-5522 or visit www.ajmfg.com.



June 19, 2020


Topic Area: Press Release


Recent Posts

Streamlined Integrated Project Delivery Tackles Design Challenges

Successful implementation of IPD Light can improve patient care, project outcomes and bottom lines.


Encompass Health Rehabilitation Hospital of Central Florida - Sumter County Opens

It is a satellite location of Encompass Health Rehabilitation Hospital of Central Florida.


Rudolph and Sletten Awarded $960M for New UCSF Benioff Children's Hospital

Construction work is expected to commence in September 2025 with substantial completion anticipated in 2031.


How Designers Create Welcoming Senior Care Communities

Risk assessments and cost analysis play a role in creating thriving communities.


Data-Driven Decisions: How Analytics Are Shaping Healthcare Facility Planning

Hospitals can use data to prioritize upgrades, extend building lifespans and maximize the impact of limited capital budgets.


 
 


FREE Newsletter Signup Form

News & Updates | Webcast Alerts
Building Technologies | & More!

 
 
 


All fields are required. This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.