AJ Manufacturing Introduces Portable Air Filtration Units for Creating COVID-19 Patient Isolation Rooms


AJ Manufacturing, a leading manufacturer of critical environment HVAC products, has introduced a portable version of its Reverse Flow Criti-Clean Ultra™ Fan Filter Unit (FFU) to quickly and easily create patient isolation rooms. The new units were specifically developed to help protect healthcare workers treating COVID-19 patients and to help reduce the spread of the virus.
 
Like the original ceiling-mounted model, the portable Reverse Flow Criti-Clean Ultra™ FFU connects to existing ductwork and creates a negative pressure environment that removes the air from a patient room and cleans it via the unit’s built-in HEPA filter, keeping airborne contaminants from escaping. The unit comes on wheels for easy movement and can be plugged into a standard electrical wall outlet.
 
“We’re proud to be able to do our small part to help protect healthcare workers who are treating the growing number of coronavirus patients,” said Rob Haake, president of AJ Manufacturing. “Our plant is 100% focused on producing both our permanent and portable FFU models for as long as they are needed to help stop the spread of the virus.”
 
In addition to reverse flow units that take in air and remove it from a room, standard FFU models – both ceiling mounted and portable – are also available to bring HEPA filtered air into a room. AJ’s ceiling mounted FFUs offer the industry’s lowest plenum height of just 13.7″, allowing easier retrofitting into existing ceiling spaces.

For more information, contact AJ Manufacturing at 816-231-5522 or visit www.ajmfg.com.



June 19, 2020


Topic Area: Press Release


Recent Posts

Aspirus Breaks Ground on New Chippewa Falls Hospital and Clinic

The estimated completion date of the facility is September 2026.


Cybersecurity Law's Expiration Could Leave Healthcare Facilities Exposed

The pending sunset of CISA 2015 threatens to weaken critical information sharing that helps healthcare facilities defend against cyberattacks.


Ground Broken on Northside Hospital Forsyth Expansion

The building and parking deck are expected to open in the fall of 2026.


Onslow Memorial Hospital Breaks Ground on New Medical Office Building

The initial facility is expected to open in January 2027.


The Fatal Flaws in Active Shooter Response in Healthcare Facilities

The most effective solutions to workplace violence are sophisticated emergency response planning and master level training for all employees.


 
 


FREE Newsletter Signup Form

News & Updates | Webcast Alerts
Building Technologies | & More!

 
 
 


All fields are required. This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.