ARMSTRONG introduces the IPS 4000 Controller featuring advanced sensorless design


Armstrong Fluid Technology has announced the introduction of its IPS 4000 (Integrated Pumping System), an advanced multi-zone control that directly integrates with pumping units to optimize energy performance, system handling and installation.

Designed with the “sensor within”, the IPS 4000 series offers a comprehensive control solution that does not rely on remote sensors to optimize the control of any variable flow HVAC system. Featuring patented Best-Efficiency staging in a headered configuration, the IPS 4000 operates in either a stand-alone mode or networked through the BMS to maximize the performance profile of up to six pumps in 12 zones.

“The IPS 4000 offers building managers energy savings under any operating condition,” said Lex van der Weerd, CEO of Armstrong Fluid Technology. “In addition, choosing a system that does not rely on remote sensors can provide measurable cost savings by avoiding the expense of purchasing and installing unnecessary equipment.”

Key features and benefits of the IPS 4000 include:

• Performance efficiency exceeding ASHRAE 90.1 2010, MEI 2015 compliant and achieving IE3

• Easy installation and integration with existing HVAC systems

• Field configurable by the user interface

• Parallel Sensorless Technology

• Cost certainty and lowest installed cost

• Enhanced performance data for optimized staging of pumps

• Multi-zone control

• Control of the by-pass valve in the de-coupler line, ensuring minimum flow rate requirements

• Automates variable primary pump stations in response to changing number of chillers/boilers

• Ability to read the flow from pumps, a flow meter or both

 



December 10, 2015


Topic Area: Press Release


Recent Posts

How Efficiency Checklists Help Hospitals Save Energy, Water and Money

Keith Edgerton explains how a simple, systematic tool can help healthcare facilities identify savings, support sustainability goals and reinvest in long-term decarbonization.


Designing with Heart: Seen Health Center Blends Cultural Warmth and Clinical Care

Case study: The Alhambra-based facility uses Wilsonart Woodgrains to create a space where comfort, tradition and durability come together for an elevated senior care experience.


Rutgers Health and University Hospital Breaks Ground on Campus Expansion

The groundbreaking follows the long-awaited demolition of administrative offices built in the 1970s.


What to Consider When Modernizing Healthcare Facilities

While there has been a call to preserve old buildings, healthcare facilities need to weigh the options of patient care.


Corewell Health Beaumont Troy Hospital to Build New Tower

The tower is expected to be completed in 2030.


 
 


FREE Newsletter Signup Form

News & Updates | Webcast Alerts
Building Technologies | & More!

 
 
 


All fields are required. This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.