ASHRAE Posts Eight Research Projects for Bid this Fall


ASHRAE is soliciting proposals for 5 new research project and 3 re-bids.  The research project titles are listed below. Proposals are due December 15th, 2019. The projects are scheduled to begin April 1st, 2020  

Please give this announcement wide and prompt distribution to all interested researchers within your organization.

  • 1683-TRP_ReBid  - Experimental Evaluation of Two-Phase Pressure Drop and Flow Pattern in U-Bends with Ammonia; Responsible Committee: TC 1.3 (Heat Transfer and Application); Co-Sponsors: TC 8.4 (Air-to-Refrigerant Heat Transfer Equipment)

  • 1780-TRP-ReBid - Test Method to Evaluate Cross-Contamination of Gaseous Contaminant within Total energy Recovery Wheels; Responsible Committee: TC 9.10 (Laboratory Systems); Co-Sponsors: TC 2.3 (Gaseous Air Contaminants and Gas Contaminant Removal Equipment; TC 9.6 (Healthcare Facilities); SSPC 62.1 (Ventilation for Acceptable Indoor Air Quality) 

  • 1799-TRP - Validation of Extrapolation if Performance Rating Test Results for Small Energy Recovery; Responsible Committee: TC 5.5 (Air-to-Air Energy Recovery)

  • 1817-TRP - Long-term Temperature Change of Ground Heat Exchangers; Responsible Committee: TC 6.8 (Geothermal Heat Pump and Energy Recovery Applications)

  • 1824-TRP - Accounting for the Barometric Pressure Impacts on Psychrometric Performance Testing of Unitary Air-Conditioning and Heat Pump Equipment; Responsible Committee: TC 8.11 (Unitary and Room Air Conditioners and Heat Pumps; Co-Sponsors: SSPC 41, Standard Methods for Measurements. 

  • 1830-TRP-ReBid - Experimental Characterization of Aircraft Bleed Air Particulate Contamination; Responsible Committee: TC 9.3 (Transportation Air Conditioning); Co-Sponsors: SSPC 161, Air Quality within Commercial Aircraft

  • 1852-TRP - Develop Performance Metric, Criteria, and Process to Measure and Predict Speech Privacy in High Performance Buildings; Responsible Committee: TC 2.6 (Sound and Vibration Control); Co-sponsors: TC 2.1 (Physiology and Human Environment); TC 4.4 (Building Materials and Building Envelope Performance); TC 9.6 (Healthcare Facilities)

  • 1865-TRP - Optimizing Supply Air Temperature Control for Dedicated Outdoor Air Systems; Responsible Committee: TC 1.4 (Control Theory and Application; Co-Sponsors: TC 8.10  (Mechanical Dehumidification Equipment and Heat Pipes)

Please go to https://www.ashrae.org/technical-resources/reserach  to access the Requests for Proposals (RFPs) for each project.



November 7, 2019


Topic Area: Press Release


Recent Posts

The Future of Healthcare Facility Construction Projects

Brian Cowperthwaite highlights the invisible work that impacts everyone who walks through a healthcare facility.


Ground Broken on Jupiter Medical Center's Second Hospital

The 53,000-square-foot hospital will include 29 inpatient beds, four operating rooms, 24-hour emergency services, a diagnostic laboratory and imaging services.


Singing River Health System Ensnared by Data Breach

Through an investigation, on February 10, 2026, SRHS learned that the unauthorized party had accessed certain SRHS files that contained patient information.


Partnering on Personnel: Strategies for Success

Environmental services in healthcare have special staffing circumstances. They must meet stringent compliance standards and maintain accreditations.


Kaiser Permanente Opens First Two Medical Offices in Northern Nevada

These are part of its joint venture with Renown Health.


 
 


FREE Newsletter Signup Form

News & Updates | Webcast Alerts
Building Technologies | & More!

 
 
 


All fields are required. This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

 
 
 
 

Healthcare Facilities Today membership includes free email newsletters from our facility-industry brands.

Facebook   Twitter   LinkedIn   Posts

Copyright © 2023 TradePress. All rights reserved.