Adaptive Reuse Brings Clinic to Historic Building

Milwaukee project transforms 1847 firehouse into clinical location

By By Dan Hounsell


Everything old is new again — or it can be, at least, thanks to the increasingly common architectural strategy of adaptive reuse.

An adaptive reuse project in Milwaukee’s Historic Third Ward has been converted an 1847 firehouse into a clinical location called the Ascension Medical Group–Historic Third Ward Clinic Project, thanks to the work of architecture and design firm Eppstein Uhen Architects (EUA), according to Healthcare Construction+Operations

Ascension has since transferred its operations to the 11,000-square-foot Historic Third Ward clinic from its previous downtown location. The new clinic will offer state-of-the-art medical facilities to its patients. Services offered will include women’s health, labs, and X-ray and ultrasound facilities.

Designers say the adaptive reuse and renovation revitalized the former home of the Milwaukee Fire Department’s Engine Company No. 10. One of the biggest challenges for the designers was a disparity between the floor levels of two renovated areas, which differed by several feet. The firm said this offered a chance to use the firehouse space for non-clinical registration and create waiting areas for patients and their families prior to them moving up into the clinical setting.

Additionally, the historic structure’s tight column spacing required the designers to be flexible and innovative while fashioning a space that is up to date with healthcare standards and local building codes.

Click here to read the article.



March 4, 2021


Topic Area: Architecture


Recent Posts

Mold Matters: Strategies for Prevention and Remediation

Understanding how to detect mold early, assess its risks and implement effective mitigation is essential to ensure a safe environment.


The Queen's Health Systems Acquires Behavioral Hospital from Sutter Health Pacific

It will connect the behavioral health hospital with a broader continuum of local care.


The Impact of Lighting on Aesthetics and Atmosphere in Healthcare

Lighting manufacturers discuss how lighting affects the look and feel of healthcare facilities.


Nearby Explosion Damages Avera St. Anthony's Hospital in Nebraska

No major injuries to patients or employees were reported.


Baptist Memorial Hospital-Collierville to Begin Expansion Project Construction

The expansion for the ICU is expected to be complete in the fall of 2025, with the emergency department to be complete a few months after.


 
 


FREE Newsletter Signup Form

News & Updates | Webcast Alerts
Building Technologies | & More!

 
 
 


All fields are required. This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

 
 
 
 

Healthcare Facilities Today membership includes free email newsletters from our facility-industry brands.

Facebook   Twitter   LinkedIn   Posts

Copyright © 2023 TradePress. All rights reserved.