Advanced layout simplified - Hilti layout system PLT 300



Contractors will find advanced layout simple with the Hilti Layout system PLT 300.  This new layout system makes everyday layout and measuring tasks easier than ever.  But best of all, layout jobs can be completed quickly and efficiently by just one person for increased productivity when compared to traditional methods.

 The PLT 300 virtually eliminates a learning curve as no leveling is required and the new Hilti Auto-Stationing technology allows for easy automatic station set-up.  Layout and recording jobsite information is made easy with a green laser pointer for greater visibility.

Built for tough jobsite conditions, the PLT 300 comes with the PLC 300 controller, a tablet with a 7 inch display that has permanent wireless contact with the total station putting the complete building plan in the palm of your hand.  Building Information Modeling (BIM) and “jobsite to BIM” data flow are now at your fingertips. The easy user interface makes it simple to use the system outdoors on the ground or on facades, or indoors on floors, ceilings and walls, and checking positions on plans and measurements for as-builts.

The Hilti Layout system PLT 300 is backed by Hilti’s Calibration Service to help ensure reliability and accuracy.  Even with Hilti’s built-in protection features, precision instruments can be affected by everyday use and more. Through the Calibration Service, the PLT 300 will be calibrated and adjusted as needed, with the calibration confirmed in writing.

The Hilti Layout system PLT 300 is covered by Hilti’s Tool Warranty 20/2/1 which consists of 20 years of repair or replacement of defective parts; 2 year no cost repair including wear and tear; and a guaranteed 1-day turn-around on repairs.*

For more information, visit www.us.hilti.com.

 



July 22, 2016


Topic Area: Press Release


Recent Posts

Grounding Healthcare Spaces in Hospitality Principles

Thoughtful design can establish the calm of a spa and the restorative feeling of a resort in healthcare spaces, bringing benefits for patients and care providers.


UC Davis Health Selects Rudolph and Sletten for Central Utility Plant Expansion

Work is already underway with substantial completion anticipated in the fall of 2027.


Cape Cod Healthcare Opens Upper 2 Floors of Edwin Barbey Patient Care Pavilion

The first two floors opened for patients in May 2025 and house the Davenport-Mugar Cancer Center.


Building Sustainable Healthcare for an Aging Population

Traditional responses — building more primary and secondary care facilities — are no longer sustainable.


Froedtert ThedaCare Announces Opening of ThedaCare Medical Center-Oshkosh

The organization broke ground on the health campus in March 2024.


 
 


FREE Newsletter Signup Form

News & Updates | Webcast Alerts
Building Technologies | & More!

 
 
 


All fields are required. This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

 
 
 
 

Healthcare Facilities Today membership includes free email newsletters from our facility-industry brands.

Facebook   Twitter   LinkedIn   Posts

Copyright © 2023 TradePress. All rights reserved.