Aircuity Announces its Airside Efficiency Platform to improve energy efficiency and indoor environmental quality


 Aircuity, maker of smart automated airside solutions, announces that its airside efficiency platform has been included in a major retrofit project by the National Research Council of Canada (NRC). The NRC’s building in Saskatoon, Saskatchewan is utilizing two Aircuity Sensor Suites (SSTs) in its laboratory spaces and one SST for exhaust fan control.

“Over the last decade, airside efficiency has proved to be the biggest single energy efficiency conservation measure available for laboratory spaces,” says Dan Diehl, CEO at Aircuity.

“Implementing energy retrofit projects in a lab environment is challenging,” explains Mark Newman, Energy Management Officer at the National Research Council. “But these same challenges also present the NRC with significant opportunities to conserve energy, reduce its environmental footprint and yield substantial savings on operating costs.” 

Aircuity’s smart platform saves energy, gives building users access to intelligent data about their spaces, and enables a healthier environment for occupants. The system improves cognitive function and productivity, reduces environmental health and safety risks and promotes sustainability initiatives as part of a smart building strategy.

For additional information on the company and its solutions, please visit: http://www.aircuity.com.



April 17, 2017


Topic Area: Press Release


Recent Posts

Contaminants Under Foot: A Closer Look at Patient Room Floors

So-called dust bunnies on hospital room floors contain dust particles that turn out to be the major source of the bacteria humans breathe.


Power Outages Largely Driven by Extreme Weather Events

Almost half of power outages in the United States were caused by extreme weather events.


Nemours Children's Health Opens New Moseley Foundation Institute Hospital


Code Compliance Isn't Enough for Healthcare Resilience

Intensifying climate risks are pushing hospitals to think beyond code requirements and toward long-term resilience.


Ribbon Cutting Marks First Phase Completion for New Montefiore Einstein Facility

The second phase is expected to be completed in the second half of 2027.


 
 


FREE Newsletter Signup Form

News & Updates | Webcast Alerts
Building Technologies | & More!

 
 
 


All fields are required. This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.