Ameresco Partners with UCI Health to Power All-Electric, Zero-Emission Hospital Campus

Solar photovoltaic arrays will power the all-electric medical campus.

By HFT Staff


Ameresco, Inc. announced its collaboration with the University of California, Irvine and its health system, UCI Health, to install two solar photovoltaic (PV) arrays atop new parking structures at the innovative, all-electric, zero-emission medical campus with the acute care hospital set to open in 2025. This initiative represents a major step towards UCI Health’s goal of achieving carbon neutrality and procuring 100 percent clean energy, making the new UCI Health – Irvine Campus Medical Complex in addition to The Joe C. Wen & Family Center for Advanced Care one of the most sustainable healthcare facilities in the nation. 

Ameresco is responsible for the turnkey design, engineering, arrangement of financing and construction of the new PV systems. In addition, Ameresco will provide operation and maintenance services to ensure optimal system performance over the full 25-year power purchase agreement (PPA) term. The PV arrays, with a combined capacity of approximately 1.4 MW, are expected to generate over 2.3 million kWh of clean energy in the first year alone equivalent to the annual energy consumption of over 200 homes. 

The UCI Health – Irvine medical campus opened in 2024, with outpatient care at the Joe C. Wen & Family Center for Advanced Care and the Chao Family Comprehensive Cancer Center and Ambulatory Care building. The final phase includes a 144-bed acute care hospital and is slated to open in 2025, providing state-of-the-art medical care to the surrounding community. 



November 19, 2024


Topic Area: Energy and Power


Recent Posts

What Accessibility in Senior Care Facilities Should Look Like

The future of design for senior care facilities should go beyond compliance.


Why Identity Governance Is Becoming a Facilities Management Issue

As healthcare buildings grow more connected, weak identity controls can expose HVAC, security and other critical systems to serious risk.


Montefiore Mount Vernon Hospital Unveils Phase 1 of Emergency Department Renovations

Phase 1 of the emergency department renovations brings 11 new patient beds, two triage rooms and an isolation room.


Making Multi-Site Lighting Upgrades Work

Success requires a program structure that connects audits, financial analysis, rebate administration, procurement, scheduling and closeout documentation.


Designing a Positive Care Destination for Children

The new Mary Bridge Children’s Hospital reimagines the healthcare experience to create an environment that feels welcoming from arrival to discharge.


 
 


FREE Newsletter Signup Form

News & Updates | Webcast Alerts
Building Technologies | & More!

 
 
 


All fields are required. This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

 
 
 
 

Healthcare Facilities Today membership includes free email newsletters from our facility-industry brands.

Facebook   Twitter   LinkedIn   Posts

Copyright © 2023 TradePress. All rights reserved.