Ameresco Partners with UCI Health to Power All-Electric, Zero-Emission Hospital Campus

Solar photovoltaic arrays will power the all-electric medical campus.

By HFT Staff


Ameresco, Inc. announced its collaboration with the University of California, Irvine and its health system, UCI Health, to install two solar photovoltaic (PV) arrays atop new parking structures at the innovative, all-electric, zero-emission medical campus with the acute care hospital set to open in 2025. This initiative represents a major step towards UCI Health’s goal of achieving carbon neutrality and procuring 100 percent clean energy, making the new UCI Health – Irvine Campus Medical Complex in addition to The Joe C. Wen & Family Center for Advanced Care one of the most sustainable healthcare facilities in the nation. 

Ameresco is responsible for the turnkey design, engineering, arrangement of financing and construction of the new PV systems. In addition, Ameresco will provide operation and maintenance services to ensure optimal system performance over the full 25-year power purchase agreement (PPA) term. The PV arrays, with a combined capacity of approximately 1.4 MW, are expected to generate over 2.3 million kWh of clean energy in the first year alone equivalent to the annual energy consumption of over 200 homes. 

The UCI Health – Irvine medical campus opened in 2024, with outpatient care at the Joe C. Wen & Family Center for Advanced Care and the Chao Family Comprehensive Cancer Center and Ambulatory Care building. The final phase includes a 144-bed acute care hospital and is slated to open in 2025, providing state-of-the-art medical care to the surrounding community. 



November 19, 2024


Topic Area: Energy and Power


Recent Posts

Resilience Planning in Remote Healthcare Facilities

Assumptions about equipment failures and response times change when a hospital is hundreds of miles from the nearest major city.


Missouri Southern State University Opens Roy Blunt Health Science Innovation Center

The project broke ground in April 2024.


HCA Florida Unveils Plans for New Cape Coral Hospital

The planned hospital will be located where HCA Florida Cape Coral Emergency currently operates.


5 Reasons Engineering is the Edge in Healthcare Master Planning

The most successful plans go further to unlock smarter investments, improve resilience and enable better patient outcomes.


Building an AI-Ready Healthcare Facility 

Creating a secure, standardized data foundation can help facilities teams put AI to work more effectively.


 
 


FREE Newsletter Signup Form

News & Updates | Webcast Alerts
Building Technologies | & More!

 
 
 


All fields are required. This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.