Ameresco Partners with UCI Health to Power All-Electric, Zero-Emission Hospital Campus

Solar photovoltaic arrays will power the all-electric medical campus.

By HFT Staff


Ameresco, Inc. announced its collaboration with the University of California, Irvine and its health system, UCI Health, to install two solar photovoltaic (PV) arrays atop new parking structures at the innovative, all-electric, zero-emission medical campus with the acute care hospital set to open in 2025. This initiative represents a major step towards UCI Health’s goal of achieving carbon neutrality and procuring 100 percent clean energy, making the new UCI Health – Irvine Campus Medical Complex in addition to The Joe C. Wen & Family Center for Advanced Care one of the most sustainable healthcare facilities in the nation. 

Ameresco is responsible for the turnkey design, engineering, arrangement of financing and construction of the new PV systems. In addition, Ameresco will provide operation and maintenance services to ensure optimal system performance over the full 25-year power purchase agreement (PPA) term. The PV arrays, with a combined capacity of approximately 1.4 MW, are expected to generate over 2.3 million kWh of clean energy in the first year alone equivalent to the annual energy consumption of over 200 homes. 

The UCI Health – Irvine medical campus opened in 2024, with outpatient care at the Joe C. Wen & Family Center for Advanced Care and the Chao Family Comprehensive Cancer Center and Ambulatory Care building. The final phase includes a 144-bed acute care hospital and is slated to open in 2025, providing state-of-the-art medical care to the surrounding community. 



November 19, 2024


Topic Area: Energy and Power


Recent Posts

Building Envelopes Emerge As Key Facility Components

From enclosure commissioning and air-moisture control to decarbonization and thermal comfort, exterior systems affect energy efficiency and resilience.


Catholic Medical Center Breaks Ground on New Central Energy Plant

The new central energy plant is expected to be completed in early 2027.


Cottage Hospital Ensnared in Data Breach

On December 8, 2025, Cottage Hospital learned that an unauthorized party gained access to its computer network and took some of its files.


Biofilm 'Life Raft' Changes C. Auris Risk

Microscopic survival structure protects fungal pathogen from disinfectants and help it survive for long periods.


How Healthcare Restrooms Are Rethinking Water Efficiency

Manufacturers discuss strategies, technologies and design approaches that help healthcare facilities meet their sustainability goals.


 
 


FREE Newsletter Signup Form

News & Updates | Webcast Alerts
Building Technologies | & More!

 
 
 


All fields are required. This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.