Aquajet Systems’ New Ergo Climber Delivers Hydrodemolition Power from Scaffolding Pipes


Aquajet Systems AB, a global leader in hydrodemolition machine manufacturing, introduces the Ergo Climber attachment for its new Ergo System hydrodemolition robot. The Climber attaches to any standard scaffolding pipes and robotically moves along them to deliver powerful hydrodemolition forces for systematic vertical concrete or refractory removal, such as high-rise construction, petrochemical facilities, and other industrial applications. 

Aquajet showcased the Ergo Climber at World of Concrete 2019 in Las Vegas.

“Combining the power of the Ergo System with the maneuverability and precision of the Ergo Climber gives demolition contractors a fast, efficient solution for challenging concrete removal jobs,” said Roger Simonsson, Aquajet Systems managing director. “It uses something already on a jobsite — scaffolding — and turns it into a frame for safe and simple controlled concrete removal.”

The Climber’s roller beam and hydraulically synchronized left and right climbers robotically move and position the attached Power Head, directing the water jet to remove concrete from areas 9.8 inches (0.25 meter) to 6.6 feet (2 meters) wide. Aquajet’s high-pressure Power Pack provides the required water pressure and flow. The Ergo System’s controller unit powers and controls the hydraulics. It uses intelligent sensing to allow the operator to program the lance for optimal material removal. The Power Head oscillation is adjustable to 8 or 14 degrees. The lance angle is modifiable up to 45 degrees. The combination results in contractors being able to remove as much as 9 cubic feet of concrete per hour.

Aquajet Systems designed the Climber with spring-loaded, high-friction rollers that connect to a lightweight roller beam with just one bolt. Contractors attach the all-wheel drive system to scaffolding pipe with two spring-loaded handles — one for the right and one for the left. The system offers a better grip and aids in the consistency of movement. Safety latches secure the handles in the locked position. The Climber travels well over most types and condition of pipe, including bent pipe, pipe joints, aluminum and steel pipe. Operators can arrange scaffolding to maximize the Climber’s effectiveness in a variety of applications.

The compact Ergo System serves as an effective alternative to hand lances, producing as much as four times the water reaction force —1,000 newtons — to remove concrete while leaving steel reinforcement unscathed.

Beyond the simplicity of the single-bolt connection, the Ergo Climber weighs just 48 pounds and can be carried by one person, making it easier than ever for a contractor to add hydrodemolition services to their offerings. In addition, the Climber system’s power head features interchangeable parts with the Ergo Spine and operators can use the Spine roller beam with the Climber, improving convenience for contractors who own both systems.

Further, Aquajet’s Training Academy ensures contractors new to hydrodemolition have all the experience and resources they need to be successful. For more information on the Ergo System, Climber or Training Academy, go to www.aquajet.se or email aquajet@aquajet.se.

 



March 15, 2019


Topic Area: Press Release


Recent Posts

How Efficiency Checklists Help Hospitals Save Energy, Water and Money

Keith Edgerton explains how a simple, systematic tool can help healthcare facilities identify savings, support sustainability goals and reinvest in long-term decarbonization.


Designing with Heart: Seen Health Center Blends Cultural Warmth and Clinical Care

Case study: The Alhambra-based facility uses Wilsonart Woodgrains to create a space where comfort, tradition and durability come together for an elevated senior care experience.


Rutgers Health and University Hospital Breaks Ground on Campus Expansion

The groundbreaking follows the long-awaited demolition of administrative offices built in the 1970s.


What to Consider When Modernizing Healthcare Facilities

While there has been a call to preserve old buildings, healthcare facilities need to weigh the options of patient care.


Corewell Health Beaumont Troy Hospital to Build New Tower

The tower is expected to be completed in 2030.


 
 


FREE Newsletter Signup Form

News & Updates | Webcast Alerts
Building Technologies | & More!

 
 
 


All fields are required. This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

 
 
 
 

Healthcare Facilities Today membership includes free email newsletters from our facility-industry brands.

Facebook   Twitter   LinkedIn   Posts

Copyright © 2023 TradePress. All rights reserved.