Armstrong Fluid Technology introduces its new E Series pump-less volute kit


Armstrong Fluid Technology has announced the introduction of its E.2 Pump-Less Volute (PLV) kit which is designed to upgrade, renew or replace all working parts of all models in the E Series family of circulators. The kits are suitable for both hydronic fluid and potable water applications and include all the new features that were introduced with the second generation of the E Series.

The E.2 Series are energy-efficient, Dry Motor circulators designed for a wide range of applications. They include a permanently lubricated mechanical seal that can be replaced quickly and easily. Featuring improved durability and enhanced protection against leakage and water damage to electrical components, the key design elements of the E.2 Series include:

• New water slinger to protect motor against water intrusion

• Larger, stainless steel shaft

• Sealed, permanently lubricated bearings

• Bellows-style mechanical seal with silicon carbide wear surfaces

The energy-efficient dry motor design and hydraulics of the E.2 Series circulator is rated higher than many other fixed speed circulators in its class, and the wire-to-water efficiency provides more energy savings for building owners.  The compact size of the E.2 Series circulators, with minimized flange-to-flange dimensions, makes installation easy and also allows contractors to complete an installation without making changes to existing piping.

Because the new E.2 PLV Kits are also compatible with the original E series, it is now possible to upgrade the older series to the latest E.2 Series technology.

 



May 6, 2015


Topic Area: Press Release


Recent Posts

Healthcare Is the New Retail

How site selection strategies are shaping the future of medical real estate.


Bridgeway Behavioral Health Services Launches Campaign to Renovate Health Center

The $2 million capital campaign aims to renovate and expand the outpatient behavioral health center in Elizabeth, New Jersey.


Ground Broken for New North Dakota State Hospital

The 300,000-square-foot facility in Jamestown will provide 140 beds in a modern, trauma-informed care environment.


AI Usage for Healthcare Facilities

People in all industries are finding more use cases for artificial intelligence.


Ground Broken on Pelican Valley Senior Living Modernization Project

It is expected to reach completion in early-mid 2027.


 
 


FREE Newsletter Signup Form

News & Updates | Webcast Alerts
Building Technologies | & More!

 
 
 


All fields are required. This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.