Armstrong Natural Creations luxury vinyl tile with the I-Set installation system


Natural Creations® Luxury Vinyl Tile with the I-Set™ Installation System from Armstrong Commercial Flooring has been recognized by Design Journal and Archinterious as one of the best products of 2014.

Natural Creations with the I-Set™ Installation System is a revolutionary flooring solution with a factory-applied adhesive, so installations can be completed in about ½ the time of traditional methods using less installation materials.  With no wait time and immediate occupancy, the I-Set Installation System can restore revenue-producing spaces to operational status quickly; and it’s easy to maintain, repair and replace. 

“With all the innovative design and construction practices we see today, this validates further that the market wants technologically advanced and visually exciting flooring products such as Natural Creations with the I-Set™ Installation System.  It provides great designs in an innovative, easy-to-install, easy to maintain, long-lasting product,” said Brian Saker, Product & Design Manager, Armstrong Commercial Flooring.

ADEX stands for Awards for Design Excellence and is the largest and most prestigious awards program for product & project design in the A&D industry which recognizes firms who have produced distinguished architectural and interior design products. Design Journal, the international trade publication for interior designers, architects and facility managers since 1988 is the proud sponsor of the ADEX Awards.

For information, visit www.armstrong.com.

About Armstrong

Armstrong World Industries, Inc., a global leader in the design and manufacture of floors and ceilings is Inspiring Great Spaces™ each and every day.  Based in Lancaster, Pa., Armstrong operates 34 plants in eight countries and has approximately 8,700 employees worldwide. Armstrong is systematically reducing our environmental footprint and providing products and services that enable our customers to reduce the environmental impact of the buildings they create. For more information visit www.armstrong.com.

 



January 21, 2015


Topic Area: Press Release


Recent Posts

Infrastructure Issues: Assisting Mobility-Challenged Visitors

Parking constraints, mobility needs and patient experience priorities are elevating arrival pathways as a strategic planning issue.


Willis-Knighton Medical Center Upgrades Chilled Water Plant

The medical center sought upgrades through Trane to add capacity, control comfort, increase redundancy and reduce energy costs.


NYC Health + Hospitals Reports Data Breach

It appears that the unauthorized actor may have gained access to NYC Health + Hospitals systems due to a security breach at a third-party vendor.


Redefining What Mental Health Facilities Look Like

A new Mental Health and Addictions Center uses design and architecture to challenge the stigma and create a more open model of care.


Managing High-Volume Laundry Operations 

Tips and tricks one director has learned in three decades of managing a large, high-volume laundry operation.


 
 


FREE Newsletter Signup Form

News & Updates | Webcast Alerts
Building Technologies | & More!

 
 
 


All fields are required. This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.