Blastcrete Equipment Tier 4 Final Products Meet Emission Standards


Blastcrete Equipment LLC, a longtime manufacturer of shotcrete and gunite mixers and pumps, announces the completion of the transition to Tier 4 Final-compliant products for the full line of Blastcrete Equipment. This includes the RS180 Mixer-Pump and MX-10 Mixer-Pump. Recently finalized upgrades for Tier 4 Final compliant products feature the same user-friendly, low maintenance design, but allow contractors to stay ahead of changing emission standards.

The Tier 4 Final RS180 Mixer-Pump is an economical option for gypsum flooring underlayment, grouting, cellular concrete and some wet shotcrete applications. Powered by a reliable 55-horsepower Yanmar water-cooled diesel engine, the pump offers variable speed from 0-18 cubic yards per hour with long-distance and high-volume pumping capabilities. The adjustable pumping pressure adds durability and maximizes the longevity of wear components, extending the life of the machine.

Blastcrete’s MX-10 Mixer-Pump offers faster and greater ROI on demanding refractory wet shotcrete and pump cast applications in foundries, power generation, petrochemical, steel mills and cement manufacturing facilities. The closed-loop hydraulic circuit delivers greater speed and torque to quickly and effectively mix dense refractory materials in less than two minutes. The unit is powered by a Tier 4 Final 108-horsepower JCB water-cooled diesel engine.

All Blastcrete products are backed by a dedicated team of industry experts for outstanding customer service.

More information: www.blastcrete.com



December 9, 2019


Topic Area: Press Release


Recent Posts

Seeking Standards for Microbial Loads in Healthcare Facilities

Why is there no binding standard for the acceptable microbial load on surfaces or in the air in hospitals?


UCR Health Unveils Plans for Major Expansion

The vision for the site will include an outpatient diagnostic center and possible future expansion.


High-Performance Windows Support Safety at UW Medicine's New Behavioral Health Center

Case study: Engineered for strength, quiet and daylight, the chosen windows help create a safe, calming and energy-efficient environment for patients and providers.


Central Maine Healthcare Dealing with IT System Outage

The organization identified unusual activity within their computer software, prompting them to secure and shut off all IT systems.


Kaiser Permanente Opens Newly Expanded Everett Medical Center

The facility offers primary care and pediatric care and has specialty care departments.


 
 


FREE Newsletter Signup Form

News & Updates | Webcast Alerts
Building Technologies | & More!

 
 
 


All fields are required. This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.