Blastcrete Equipment Tier 4 Final Products Meet Emission Standards


Blastcrete Equipment LLC, a longtime manufacturer of shotcrete and gunite mixers and pumps, announces the completion of the transition to Tier 4 Final-compliant products for the full line of Blastcrete Equipment. This includes the RS180 Mixer-Pump and MX-10 Mixer-Pump. Recently finalized upgrades for Tier 4 Final compliant products feature the same user-friendly, low maintenance design, but allow contractors to stay ahead of changing emission standards.

The Tier 4 Final RS180 Mixer-Pump is an economical option for gypsum flooring underlayment, grouting, cellular concrete and some wet shotcrete applications. Powered by a reliable 55-horsepower Yanmar water-cooled diesel engine, the pump offers variable speed from 0-18 cubic yards per hour with long-distance and high-volume pumping capabilities. The adjustable pumping pressure adds durability and maximizes the longevity of wear components, extending the life of the machine.

Blastcrete’s MX-10 Mixer-Pump offers faster and greater ROI on demanding refractory wet shotcrete and pump cast applications in foundries, power generation, petrochemical, steel mills and cement manufacturing facilities. The closed-loop hydraulic circuit delivers greater speed and torque to quickly and effectively mix dense refractory materials in less than two minutes. The unit is powered by a Tier 4 Final 108-horsepower JCB water-cooled diesel engine.

All Blastcrete products are backed by a dedicated team of industry experts for outstanding customer service.

More information: www.blastcrete.com



December 9, 2019


Topic Area: Press Release


Recent Posts

Backup Power Is a Lifeline: What Healthcare Facility Managers Must Get Right

From compliance and patient safety to community resilience, facility managers must prioritize preventive maintenance, training and technology to ensure uninterrupted power.


3 Pillars of Stronger Cybersecurity in Healthcare

These strategies can help healthcare facilities stay ahead of evolving cyber threats.


Piedmont Fayette Hospital to Build New Patient Tower

The renovation and expansion project will extend to other areas of the hospital, including surgical services, kitchen, lab, pharmacy and more.


Texas HHSC Announces Construction of New Lubbock Psychiatric Center

The hospital is designed with the latest mental healthcare standards in mind to promote recovery and healing.


Armed Standoff at West Virginia Hospital Reminds of the Need for Safety Measures

The alleged suspect, who's now in custody, was also linked to earlier bomb threats.


 
 


FREE Newsletter Signup Form

News & Updates | Webcast Alerts
Building Technologies | & More!

 
 
 


All fields are required. This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.