Building information modeling can benefit space management

Automation and data can increase efficiency in healthcare facilities


The cost of operations, maintenance and management of a healthcare facility can run up to 85 percent of a building’s total life-cycle costs, but building information modeling (BIM) and other analytical tools can help to control costs and help buildings to run more efficiently, according to an article on the Health Facilities Management website. 

While BIM typically is known for its design and construction applications, it also is starting to play a role in building management and operations.

BIM is valuable for calculating square footage precisely and in half the time of other methods, the article said. That information is critical for determining Medicare and Medicaid reimbursements and each department’s share of those funds.

BIM can also be useful for managing hospitals designed with the software, because it is populated with data from the building model used for the design. BIM can then track, manage and control building systems ranging from mechanical equipment to door locks to lighting, the article said.

Read the article.

 

 



January 6, 2015



Recent Posts

How Efficiency Checklists Help Hospitals Save Energy, Water and Money

Keith Edgerton explains how a simple, systematic tool can help healthcare facilities identify savings, support sustainability goals and reinvest in long-term decarbonization.


Designing with Heart: Seen Health Center Blends Cultural Warmth and Clinical Care

Case study: The Alhambra-based facility uses Wilsonart Woodgrains to create a space where comfort, tradition and durability come together for an elevated senior care experience.


Rutgers Health and University Hospital Breaks Ground on Campus Expansion

The groundbreaking follows the long-awaited demolition of administrative offices built in the 1970s.


What to Consider When Modernizing Healthcare Facilities

While there has been a call to preserve old buildings, healthcare facilities need to weigh the options of patient care.


Corewell Health Beaumont Troy Hospital to Build New Tower

The tower is expected to be completed in 2030.


 
 


FREE Newsletter Signup Form

News & Updates | Webcast Alerts
Building Technologies | & More!

 
 
 


All fields are required. This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.