Caddy Pyramid Equipment Supports offers innovative support for rooftop systems


SOLON, Ohio  – CADDY PYRAMID Equipment Supports offer a fast, flexible method for supporting chillers, air conditioners and other heavy-duty mechanical services on rooftop surfaces. The system contains post-base assemblies, equipment-support clamps and a frame, and it can be assembled and adjusted to size and height in minutes by one person with one tool. And, unlike traditional methods, this system features a hot-dip galvanized finish for superior corrosion protection.

The innovative design of the thermoplastic base evenly distributes the load to help prevent damage to the roof membrane. The crossbar and equipment support clamps help ensure a quick and easy assembly. Once assembled, the support can be lifted as one unit and easily relocated.

CADDY PYRAMID Equipment Supports, part of the CADDY® line of fasteners and supports from ERICO, are available with 4- or 6-post base configurations. The system supports green building requirements; the bases are made from recycled material and can contribute to earning LEED credit.

For more information on this unique support system, call 1-800-333-0852 or visit www.erico.com/products/CADDY_PYRAMID_Equipment_Support_Kit.asp.



ERICO is a leading global designer, manufacturer and marketer of precision-engineered specialty metal products serving niche markets in a diverse range of electrical, construction, utility and rail applications. The company is headquartered in Solon, Ohio, USA with a network of sales locations serving more than 30 countries and with manufacturing and distribution facilities worldwide. ERICO primary brand names are: CADDY® electrical and mechanical fixings, fasteners and supports; LENTON® concrete reinforcement products; and ERICO electrical products, which include CADWELD® exothermic welded connection products, ERICO® rail and industrial products, ERIFLEX® low-voltage power distribution products, and ERITECH® facility electrical protection products. Visit ERICO online at www.erico.com.



June 27, 2013


Topic Area: Press Release


Recent Posts

Cooling Towers at NYC Health + Hospitals/Lincoln Test Positive for Legionella

Hospital among the positive tests at 10 cooling towers in South Bronx.


Prefabricated Wall Panels Accelerate UCF Lake Nona Medical Center Construction

Case study: StoPanel exterior wall systems helped Wal-Mark Contracting meet strict Florida wind-load requirements and complete 136 panels in just 11 days.


University of Rhode Island Adds Clinical Space

Space dedicated to training students in counseling-related programs doubles in size.


How Retail Design Principles Can Improve Healthcare Wayfinding

Healthcare facilities are adopting retail-inspired design strategies to make spaces easier to navigate and more comfortable for patients.


Flexible Design Strategies Help OhioHealth Maximize Clinical Space

Doing more with less was key to the renovated facility’s design.


 
 


FREE Newsletter Signup Form

News & Updates | Webcast Alerts
Building Technologies | & More!

 
 
 


All fields are required. This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

 
 
 
 

Healthcare Facilities Today membership includes free email newsletters from our facility-industry brands.

Facebook   Twitter   LinkedIn   Posts

Copyright © 2023 TradePress. All rights reserved.