Configure, commission and troubleshoot packaged units faster with Fault Detection and Diagnostics from Luxaire


Fault Detection and Diagnostics (FDD) from the Luxaire® brand of Johnson Controls helps building professionals maximize rooftop unit performance. Available exclusively with Simplicity® Smart Equipment (SE) Controls, FDD technology monitors refrigeration circuit temperatures and pressures, economizer operation and outdoor humidity and temperatures. If issues arise, FDD provides easy access to detailed alerts, speeding up response to situations before they lead to possible equipment performance issues. Detailed alerts are accessible anytime from a smartphone or other remote device. With the Simplicity SE Controls Mobile Access Portal (MAP) gateway, alerts can be viewed on a web browser.

FDD simplifies the service process by reducing the steps to: a contractor discovering an issue, a contractor diagnosing the problem and a tech arriving to do the repair with the parts already in-hand. All system data is in-hand before anyone sees the equipment, and refrigerant gauges or temperature probes are not required for troubleshooting since FDD provides all the required sensor, fault and diagnostics data.

With FDD, contractors can configure, commission and troubleshoot packaged units faster; engineers can confidently confirm specifications; and building owners can cut energy and service costs. For more information about FDD from Luxaire, visit www.luxaire.com.



March 30, 2016


Topic Area: Press Release


Recent Posts

Contaminants Under Foot: A Closer Look at Patient Room Floors

So-called dust bunnies on hospital room floors contain dust particles that turn out to be the major source of the bacteria humans breathe.


Power Outages Largely Driven by Extreme Weather Events

Almost half of power outages in the United States were caused by extreme weather events.


Nemours Children's Health Opens New Moseley Foundation Institute Hospital


Code Compliance Isn't Enough for Healthcare Resilience

Intensifying climate risks are pushing hospitals to think beyond code requirements and toward long-term resilience.


Ribbon Cutting Marks First Phase Completion for New Montefiore Einstein Facility

The second phase is expected to be completed in the second half of 2027.


 
 


FREE Newsletter Signup Form

News & Updates | Webcast Alerts
Building Technologies | & More!

 
 
 


All fields are required. This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.