Construction Kicks Off on Health First Cape Canaveral Replacement Hospital

The new replacement hospital was designed by Lawrence Group architects.

By HFT Staff


Construction has officially kicked-off on a $410 million Health First Cape Canaveral replacement hospital, parking garage and medical office building in Merritt Island, Florida, designed by Lawrence Group architects. 

The new 120-bed hospital, three-deck parking structure and 92,000-square-foot medical office building will replace Health First’s Cape Canaveral Hospital in Cocoa Beach, as part of its new campus. 

Health First announced plans to open its new hospital and medical office building in early 2027, at which time the original Cape Canaveral Hospital would be closed. Gilbane Building Company is the general contractor on the project. Headquartered in St. Louis, Lawrence Group’s Florida office will provide local support to ensure that the project runs seamlessly and is completed on time and within budget. 

The 268,000-square-foot replacement hospital is being built on a 14-acre site, four miles inland from the original Cape Canaveral Hospital located on reclaimed land in the Banana River. Constructed in the 1960s, the six-story, 150-bed hospital was targeted for replacement, in part, due to its vulnerability to hurricanes and risk of flooding. 

To protect the new hospital from flooding during storm surges, Lawrence Group designed its ground floor 13 feet above sea level, and its exterior envelope and structure over and above code requirements to withstand a Category 4 hurricane. Additionally, the campus will be served by an on-site central energy plant, built to ensure continuous power function even during tropical storms and hurricanes. 

Incorporating the latest in patient-centered healthcare design, Lawrence Group planned the new hospital with 120 inpatient beds, 25 emergency department treatment bays and six operating suites. Lawrence Group also designed the three-story medical office building for specialty services, as well as the campus’ parking garage and lot. 

Extensive landscaping designed by Lawrence Group allows the new hospital and medical office building to integrate seamlessly into its existing environment, while providing room for greenspace, a half-mile walking trail and other connections to nature throughout the new campus.



March 28, 2024


Topic Area: Construction


Recent Posts

What 'Light' Daily Cleaning of Patient Rooms Misses

Most environmental services workers still clean as if they were wiping dust off a countertop, not disrupting a living, structured community.


Sprinkler Compliance: Navigating Code Mandates, Renovation Triggers and Patient Safety

As CMS deadlines approach and renovation projects accelerate, healthcare facility managers must understand how NFPA 101, state fire codes and sprinkler design strategies intersect.


MUSC Board of Trustees Approves $1.1B South Carolina Cancer Hospital

Research and education are intentionally embedded in the hospital’s design, with dedicated spaces for scientific collaboration, clinical investigation and training.


Study Outlines Hand Hygiene Guidelines for EVS Staff

Researchers find that current guidelines for hand hygiene don’t include EVS workers and suggest indicators to fill that gap.


McCarthy Completes $65M Sharp Rees-Stealy Kearny Mesa MOB Modernization

The completed tenant improvement includes approximately 100,000 square feet of improved space across two buildings and represents an investment of $65 million.


 
 


FREE Newsletter Signup Form

News & Updates | Webcast Alerts
Building Technologies | & More!

 
 
 


All fields are required. This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

 
 
 
 

Healthcare Facilities Today membership includes free email newsletters from our facility-industry brands.

Facebook   Twitter   LinkedIn   Posts

Copyright © 2023 TradePress. All rights reserved.