Crisp, white finish now available for Armstrong Linear Wood Grille


LANCASTER, PA – Armstrong Ceiling Systems has added a crisp, white painted finish to its line of WoodWorks® Grille Ceiling Systems, giving architects and designers the flexibility to brighten a space with a linear grille visual.

The new white finish, which is also available on WoodWorks Solid Linear panels, offers a contemporary, specialty look in a standard product.

With the addition of the new Grille White finish, WoodWorks Grille and WoodWorks Solid Linear are now available in five finish selections, including Grille Maple, Grille Light Cherry, Grille Dark Cherry, and Grille Walnut. Custom finishes are also available.

Backer and Dowel or Tegular Panels 

WoodWorks Grille is available in Backer and Dowel or Tegular panels. WoodWorks Grille Backer and Dowel panels are available in two standard blade sizes and are easily installed in the ceiling, on the wall, or as 90-degree angled or faceted ceiling-to-wall transitions. The solid wood panels can be ordered in custom blade sizes. A custom curved application with flexible backer is also available.

WoodWorks Grille Tegular panels feature solid wood blades that can be installed in a linear fashion or patterned for endless variety. Available in either vertical or horizontal blade patterns, the panels are designed so the suspension system virtually disappears. Continuous looks and clouds can be created with Axiom® Vector® trim.

For more information about WoodWorks Grille and WoodWorks Solid Linear, visit armstrong.com/woodworks, chat live, or call a U.S.-based TechLine expert at 1-877-276-7876, press 1.

Armstrong World Industries is a global leader in the design and manufacture of ceilings and floors. In 2013, Armstrong consolidated net sales from continuing operations totaled approximately $2.7 billion. Based in Lancaster, PA, Armstrong operates 35 plants in eight countries and has approximately 8,600 employees.

 



February 20, 2015


Topic Area: Press Release


Recent Posts

Gaps in Nurses' Environmental Cleaning Knowledge Grow Amid Rising EVS Pressures

Environmental cleaning is crucial in preventing HAIs, but when the responsibility falls to those outside of EVS teams, problems arise. 


Ground Broken on the Southern Nevada Forensic Facility

Construction on the new secure forensic psychiatric hospital is expected to be completed in 2029.


Jackson Hospital Falls Victim to Third-Party Cybersecurity Incident

Jackson Hospital has no evidence that any personal information has been or will be used for identity theft as a direct result of this incident.


Making Healthcare Lighting Retrofits Work

Effective operational planning determines whether a retrofit project improves a facility or creates new problems.


Stadium Design is Reshaping Healthcare Facilities

Hospitals are turning to the sports industry for innovative ways to support healing and improve the patient experience.


 
 


FREE Newsletter Signup Form

News & Updates | Webcast Alerts
Building Technologies | & More!

 
 
 


All fields are required. This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.