Plug-and-Play LED lamps from Lunera Lighting used for GSA Green Proving Ground program report


Citing energy savings between 40% - 50% with matching light levels and quality, a report published by the U.S. General Services Administration's (GSA) Green Proving Ground (GPG) program recommended plug-and-play LED downlight lamps as a replacement for compact fluorescent lamps. Plug-and-play LED downlamps used for this evaluation were provided by Lunera® Lighting. 

In 2014, plug-and-play LED downlamps provided by Lunera were selected from over 120 candidates to participate in real world testing through the GPG program. Last month, GSA released findings from a one-year evaluation in three federal buildings, by independent research lab Pacific Northwest National Laboratory (PNNL). 

PNNL assessed the light levels, energy and cost savings over time and determined that payback for the plug-and-play LED downlamps was 2.4 years compared to 12.4 years if installing or retrofitting a new LED fixture. 

LED light levels in the plug-and-play downlamps were better than or equal to measurements taken in the previous lamps. In addition, the occupants and facility managers of the test buildings were interviewed after a year of working under LED lighting and had not noticed any difference according to the report.

Standard compact fluorescent downlights were replaced with Lunera's plug-and-play LED Lamps in the U.S. General Services Administration's regional headquarters in Auburn, Washington; the Cabell Federal Building in Dallas, Texas and the Veterans Administration Center in Philadelphia, Pennsylvania for this study.

Findings mentioned in this press release are based on the report, "LED Downlight Lamps for CFL Fixtures," and are available from the GPG program website, http://www.gsa.gov/portal/content/128998.

 



May 17, 2016


Topic Area: Press Release


Recent Posts

Disinfectant Contact Time: The Case for Biofilm Disruption

Contact time, while essential for compliance, does not reliably predict microbial reduction on actual healthcare surfaces.


Rethinking How Healthcare Facilities Fund Construction Projects

Rising costs and competing priorities are driving healthcare organizations to explore new financing arrangements and construction strategies.


Putting Trauma-Informed Design into Practice

Arnold's Place demonstrates how design choices can promote dignity and a sense of control for those experiencing homelessness.


Harris Health to Build New Freestanding Cancer Center

The center is planned to open in 2029, following the opening of the new O'Quinn Hospital along the North Loop at Lockwood.


Inland Empire Health Plan Opens Expanded San Bernardino Community Wellness Center

The new 33,000-square-foot center is nearly three times the size of the original location off Second Street.


 
 


FREE Newsletter Signup Form

News & Updates | Webcast Alerts
Building Technologies | & More!

 
 
 


All fields are required. This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

 
 
 
 

Healthcare Facilities Today membership includes free email newsletters from our facility-industry brands.

Facebook   Twitter   LinkedIn   Posts

Copyright © 2023 TradePress. All rights reserved.