Distinct Construction Project Must Complement Existing Campus

New facility also adds urban park and parking garage

By HFT Editorial Staff


The University of California, San Francisco (UCSF) Medical Center is adding to its Mission Bay Campus with the Block 34 Clinic Building facility.

The 182,800-square-foot facility will house a wide array of medical programs, including adult urgent care, a retail pharmacy offering prescriptions and refills for both patients and local residents, imaging, adult ambulatory surgery, and multispecialty clinics including: adult primary care, dermatology, outpatient rehabilitation, cardiovascular, urology, an otolaryngology head and neck clinic, gastroenterology, endocrine, and pain management.

From a design standpoint, the Block 34 Clinic Building will provide an architectural identity for the UCSF East Campus that is distinct in appearance and character from the existing UCSF Mission Bay Campus. The facility’s building materials and aesthetics will complement the existing campus tones, and a new outdoor urban park will bridge the nearby Wayne and Gladys Valley Center for Vision to Block 34, connecting the two facilities. At the end of the block on the corner of Third and Mariposa streets is a new 500-car parking garage.

Global architecture, engineering, and consulting firm Stantec teamed with general contractor, Clark Construction on the $335.8 million project. Stantec is providing architecture, medical planning, interior design, LEED consulting, building energy modeling, and landscape architecture services.

“We are honored to work with UCSF as we look to bring the Block 34 Clinic Building vision to life,” said Adoria Huey, Stantec’s project manager. “It’s incredibly exciting to break ground on this latest project for one of the world’s premier health providers.”

Previously, Stantec designed the UCSF Medical Center at Mission Bay. The award-winning, 878,000-square-foot medical center centralizes the healthcare provider’s core service lines with three distinct hospitals within a single building. While each structure is separate, they share a platform of support services and diagnostic treatment spaces arranged along a main spine.



September 28, 2021


Topic Area: Construction


Recent Posts

Case Study: How NYU Langone Rebuilt for Resilience After Superstorm Sandy

Although the damage was severe, it provided a valuable opportunity for NYU Langone to assess structural vulnerabilities and increase facility resilience.


Frederick Health Hospital Faces 5 Lawsuits Following Ransomware Attack

The lawsuits accuse FHH of inadequate cybersecurity, poor breach notification and failing to protect patients from identity theft risks.


Arkansas Methodist Medical Center and Baptist Memorial Health Care to Merge

They have signed a non-binding letter of intent to complete a shared mission agreement to merge the two organizations.


Ground Broken on Intermountain Saratoga Springs Multi-Specialty Clinic

The clinic is scheduled to open and start seeing patients in the fall of 2026.


Electrical Fire Tests Resilience of Massachusetts Hospital

Signature Healthcare Brockton Hospital used opportunity to renovate key systems and components and expand facility operations.


 
 


FREE Newsletter Signup Form

News & Updates | Webcast Alerts
Building Technologies | & More!

 
 
 


All fields are required. This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.