Espen Technology Launches LED Emergency Driver For 0-10V Downlights & Other Fixtures


 

Espen Technology announced the launch of its new LED Emergency Driver.  Model # VEMB15W-10V (C) is an emergency lighting inverter, specially designed to operate with Espen’s commercial downlights or other 0-10V dimming fixtures, up to 15W.  
 
“This emergency driver is unique in that it allows the fixtures to be on, off, switched, unswitched, or dimmed without affecting emergency operation,” stated John Clancy, SVP of Sales & Marketing at Espen.  Clancy added, “This LED Emergency Driver overrides any 0-10V dimming signal when it’s triggered, ensuring full emergency mode light output.”  
 
Each unit consists of electronic circuitry, lithium-ion battery, “ON” LED indicator, push-to-test switch, and a charger, all enclosed in a steel case, with a 13” flexible conduit.  Electrically, the LED Emergency Driver is 120-347VAC input, with a 15W max load.  The unit provides 90 minutes of minimum emergency operating time over its full temperature range (32o-120oF), and a 24 hour maximum battery recharge time.  The VEMB15W-10V (C) comes with a 5 year warranty and meets UL924.  
 
For more information about Espen’s extensive line of LED retrofit solutions, email Info@EspenTech.com or visit www.EspenTech.com .



June 2, 2020


Topic Area: Press Release


Recent Posts

How Efficiency Checklists Help Hospitals Save Energy, Water and Money

Keith Edgerton explains how a simple, systematic tool can help healthcare facilities identify savings, support sustainability goals and reinvest in long-term decarbonization.


Designing with Heart: Seen Health Center Blends Cultural Warmth and Clinical Care

Case study: The Alhambra-based facility uses Wilsonart Woodgrains to create a space where comfort, tradition and durability come together for an elevated senior care experience.


Rutgers Health and University Hospital Breaks Ground on Campus Expansion

The groundbreaking follows the long-awaited demolition of administrative offices built in the 1970s.


What to Consider When Modernizing Healthcare Facilities

While there has been a call to preserve old buildings, healthcare facilities need to weigh the options of patient care.


Corewell Health Beaumont Troy Hospital to Build New Tower

The tower is expected to be completed in 2030.


 
 


FREE Newsletter Signup Form

News & Updates | Webcast Alerts
Building Technologies | & More!

 
 
 


All fields are required. This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

 
 
 
 

Healthcare Facilities Today membership includes free email newsletters from our facility-industry brands.

Facebook   Twitter   LinkedIn   Posts

Copyright © 2023 TradePress. All rights reserved.