Espen Technology Launches LED Emergency Driver For 0-10V Downlights & Other Fixtures


 

Espen Technology announced the launch of its new LED Emergency Driver.  Model # VEMB15W-10V (C) is an emergency lighting inverter, specially designed to operate with Espen’s commercial downlights or other 0-10V dimming fixtures, up to 15W.  
 
“This emergency driver is unique in that it allows the fixtures to be on, off, switched, unswitched, or dimmed without affecting emergency operation,” stated John Clancy, SVP of Sales & Marketing at Espen.  Clancy added, “This LED Emergency Driver overrides any 0-10V dimming signal when it’s triggered, ensuring full emergency mode light output.”  
 
Each unit consists of electronic circuitry, lithium-ion battery, “ON” LED indicator, push-to-test switch, and a charger, all enclosed in a steel case, with a 13” flexible conduit.  Electrically, the LED Emergency Driver is 120-347VAC input, with a 15W max load.  The unit provides 90 minutes of minimum emergency operating time over its full temperature range (32o-120oF), and a 24 hour maximum battery recharge time.  The VEMB15W-10V (C) comes with a 5 year warranty and meets UL924.  
 
For more information about Espen’s extensive line of LED retrofit solutions, email Info@EspenTech.com or visit www.EspenTech.com .



June 2, 2020


Topic Area: Press Release


Recent Posts

Cleanliness in Hospitals: Clinical Priority and Community Perception

EVS managers and communities value cleanliness for complementary reasons: managers for safety and compliance, communities for trust and comfort.


Dana-Farber Receives $50M Gift for Planned Cancer Hospital

A $50 million grant from the Yawkey Foundation will support construction of Dana-Farber Cancer Institute’s planned 450,000-square-foot cancer hospital.


Clarinda Regional Health Center Reports Data Security Incident

On or around December 15, 2025, Clarinda learned that certain data within its network may have been accessed without authorization.


Gaps in Nurses' Environmental Cleaning Knowledge Grow Amid Rising EVS Pressures

Environmental cleaning is crucial in preventing HAIs, but when the responsibility falls to those outside of EVS teams, problems arise. 


Ground Broken on the Southern Nevada Forensic Facility

Construction on the new secure forensic psychiatric hospital is expected to be completed in 2029.


 
 


FREE Newsletter Signup Form

News & Updates | Webcast Alerts
Building Technologies | & More!

 
 
 


All fields are required. This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

 
 
 
 

Healthcare Facilities Today membership includes free email newsletters from our facility-industry brands.

Facebook   Twitter   LinkedIn   Posts

Copyright © 2023 TradePress. All rights reserved.