A white paper titled "Put a Plan in Place Before Disaster Strikes" is available on the Medical Construction & Design website.
A pre-crisis plan is critical to minimize interruption to operations in the event of an electrical emergency.
The white paper, from Eaton, outlines the most critical aspects of disaster planning and recovery to help lessen the impact of electrical system failure.
A proper pre-crisis plan should also allow an organization to identify the following:
• The steps needed to create a successful recovery
• How to prioritize the recovery of services
• What is required to recover these services, including facilities, IT, financial and resources
• What to expect in the event of a disaster
Cooling Towers at NYC Health + Hospitals/Lincoln Test Positive for Legionella
Prefabricated Wall Panels Accelerate UCF Lake Nona Medical Center Construction
University of Rhode Island Adds Clinical Space
How Retail Design Principles Can Improve Healthcare Wayfinding
Flexible Design Strategies Help OhioHealth Maximize Clinical Space