Greenheck introduces energy recovery filter system for kitchen hoods


Greenheck’s new Energy Recovery Filter System incorporates energy recovery technology into kitchen exhaust hoods. The Energy Recovery Filter System captures the waste heat produced by the cooking appliances that would otherwise be exhausted from a kitchen hood and uses it to preheat a portion of the incoming water supply that is directed into the patented energy recovery filters. The water flowing through the filters captures the waste heat from the exhaust airstream, preheating the water supply. Preheating water before it enters a conventional water heater saves energy and reduces a restaurant’s water heating costs. As an added benefit, the water flowing through the filters naturally lowers the hood temperature, condensing more grease from the airstream. Independent third party testing shows the highly efficient Energy Recovery Filter System removes 88% of grease particles at 8 microns resulting in reduced hood and duct cleaning costs as well.

Greenheck is the worldwide leader in manufacturing and distributing air movement and control equipment.

For more information about Greenheck products, visit www.greenheck.com or contact Greenheck, PO Box 410, Schofield WI 54476-0410, (715)359-6171, FAX (715)355-2399.



November 24, 2014


Topic Area: Press Release


Recent Posts

Extreme Weather: The Maintenance-Resilience Link

Extreme heat serves as stress test of the resilience of utility systems that provide power, cooling and life safety functions.


Encompass Health Lower Providence Opens in Pennsylvania

The 50-bed inpatient rehabilitation hospital is the company's 11th location in Pennsylvania.


Intermountain Health Acquires Fairbourne Building for Healthcare Hub and Medical Campus Conversion

Construction on the interior of the building is underway with the city and Intermountain working closely together on the campus.


Cooling Towers at NYC Health + Hospitals/Lincoln Test Positive for Legionella

Hospital among the positive tests at 10 cooling towers in South Bronx.


Prefabricated Wall Panels Accelerate UCF Lake Nona Medical Center Construction

Case study: StoPanel exterior wall systems helped Wal-Mark Contracting meet strict Florida wind-load requirements and complete 136 panels in just 11 days.


 
 


FREE Newsletter Signup Form

News & Updates | Webcast Alerts
Building Technologies | & More!

 
 
 


All fields are required. This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

 
 
 
 

Healthcare Facilities Today membership includes free email newsletters from our facility-industry brands.

Facebook   Twitter   LinkedIn   Posts

Copyright © 2023 TradePress. All rights reserved.