Greenheck introduces new FumeJet fume exhaust fan package


Greenheck’s new FumeJet pre-engineered, centrifugal fume exhaust packaged models offer extended discharge to reduce and prevent exposure to harmful fumes and odors outdoors. Designed per ANSI Z9.2 standard for local exhaust systems, Models FJC and FJI provide a compact footprint with motors and drives located under a common weatherhood; complimentary accessories for quick and trouble free installation; plus configurable mounting options to suit different building layouts. The fan and stack assembly have been designed and factory tested to withstand a wind speed of 22 PSF (92 miles per hour) without the need for guy wires. With a maximum exhaust volume of 15,000 cfm and up to 8 in. wg (1250 Pa) plus multiple levels of construction, the FumeJet line provides a quick and easy alternative to a field built-up system in commercial and industrial applications.

Greenheck is the worldwide leader in manufacturing and distributing air movement, conditioning and control equipment. 

For more information about Greenheck products, visit www.greenheck.com.



June 23, 2016


Topic Area: Press Release


Recent Posts

The Difference Between Cleaning, Sanitizing and Disinfecting

Cleaning methods and products have various purposes in reducing the spread of germs.


Jupiter Medical Center Falls Victim to Third-Party Data Breach

The third party has determined through an investigation that, at least as early as January 22, 2025, an unauthorized third party gained access to personal health information on legacy systems.


Sarasota Memorial Health Care System Moves Forward on $1B in Capital Projects

The system recently began laying foundations at its new, $507 million hospital in North Port, and has several other expansion projects under way.


UCI Health Set to Open First All-Electric Hospital

All-electric acute care hospital aims to help University of California’s goal of reducing 90 percent of total carbon emissions by 2045.


Ground Broken on Baptist Health Sunrise Hospital

The planned seven-story, 340,000-square-foot facility is expected to open to patients in 2029.


 
 


FREE Newsletter Signup Form

News & Updates | Webcast Alerts
Building Technologies | & More!

 
 
 


All fields are required. This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.