Greenheck’s Energy Core Ventilator Line Continues to Grow


Energy Core Ventilators (ECV) from Greenheck transfer both sensible (heat) and latent (moisture) energy between the exhaust and supply airstreams without the airstreams mixing. The energy recovery core separates the supply and exhaust air, ensuring only fresh air is introduced into the indoor space while providing superior heat transfer and moisture permeability.

Model ECV-PM, the latest addition to Greenheck’s ECV line, features an AHRI 1060-certified polymer membrane energy recovery core manufactured from corrugated aluminum sheets used to separate the polymer membrane layers. The new polymer membrane energy core allows for low air-side pressure differentials, increasing ECV airflow capacity by 15% per housing size versus a fiber membrane. The polymer and aluminum material provides increased thermal effectiveness and allows for easy washable maintenance. Designed for indoor and outdoor mounting for commercial applications requiring 500 to 3,750 cfm of ventilation air and up to 1 in. wg, the ECV-PM is ideal for office buildings, schools, hospitals, churches, dormitories and nursing homes.

Greenheck is the worldwide leader in manufacturing and distributing air movement, conditioning and control equipment. 

For more information, contact Greenheck, P.O. Box 410, Schofield, WI 54476-0410, (715) 359-6171, FAX (715) 355-2399 or visit www.greenheck.com



October 18, 2019


Topic Area: Press Release


Recent Posts

Parking: Where the Outpatient Land Crunch Shows First

Healthcare systems that treat parking as a strategic design variable from the first feasibility pass will have more sites to choose from.


Clear Behavioral Health Opens New Outpatient Mental Health Center in Anaheim Hills

It offers an intensive outpatient program (IOP) for adults and teens ages 13 to 17 across east Anaheim and the surrounding communities.


Bon Secours Begins Construction on Freestanding Emergency Department in Norfolk

It is expected to open in late 2027.


The OR HVAC Puzzle: Why Individual Systems Are on the Rise

Extra penetrations, tight clearances and strict humidity needs—design experts explain what it really takes to plan dedicated units for each operating room.


Skanska Completes Renovation of Specialized Care Facility for Sutter Health

The project was delivered through a highly coordinated effort, utilizing advanced construction methodologies to maintain efficiency.


 
 


FREE Newsletter Signup Form

News & Updates | Webcast Alerts
Building Technologies | & More!

 
 
 


All fields are required. This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

 
 
 
 

Healthcare Facilities Today membership includes free email newsletters from our facility-industry brands.

Facebook   Twitter   LinkedIn   Posts

Copyright © 2023 TradePress. All rights reserved.