Healthcare construction delivery methods
Depending upon the type and scale of a project, the delivery method of choice will vary. There are a variety of pros and cons to consider, according to an article on the Healthcare Design website
Depending upon the type and scale of a project, the delivery method of choice will vary. There are a variety of pros and cons to consider, according to an article on the Healthcare Design website. Design-bid-build is the traditional approach: The client hires the architecture firm, which prepares design and construction documents.
Read the articles.
November 18, 2015
Topic Area:
Project Management
Recent Posts
The infection control problem is time, and it's up to facility managers, EVS directors and infection preventionists to address the problem.
First-year findings from Boston Medical Center show medical waste generates a disproportionate amount of healthcare emissions.
The clinic features colorful, sensory-friendly spaces where children work one-on-one with therapists.
Brian Cowperthwaite highlights the invisible work that impacts everyone who walks through a healthcare facility.
The 53,000-square-foot hospital will include 29 inpatient beds, four operating rooms, 24-hour emergency services, a diagnostic laboratory and imaging services.