Hord Coplan Macht Helps Expand Greater Baltimore Medical Center

HCM provided planning and design for a new 117,000 square foot addition.

By HFT Staff


Over the past several years, healthcare spaces have seen a dramatic shift in planning and design. Hospitals and doctor’s offices have been leaning on hospitality-focused design elements to create more of a welcoming, comfortable and pleasurable experience for patients. Leading design firm, Hord Coplan Macht (HCM) has leveraged this new phenomenon within their recently completed expansion of the Greater Baltimore Medical Center.  

Working collaboratively with staff and clinicians, HCM provided planning and design for a new 117,000 square foot addition to the existing hospital, which serves as the new main entrance. Taking cues from typical hospitality spaces, the team incorporated a feature piece at the entrance: a three-story light filled atrium created a peaceful, inviting first impression. Existing and new patient rooms look out onto the three-story space, giving natural cues to patients and visitors. 

To help create a community-focused facility, a thoughtful wayfinding system and intuitive design details clarify navigation. Large, undulating floor and wall patterns provide welcome and a sense of calm as they guide visitors through the new main entrance. This circulation flow minimizes anxiety through visual cues that direct visitors and staff to their destinations. Changing the scale creates privacy and contributes to a sense of well-being. Additionally, dividing the larger public space into smaller seating clusters with lowered ceilings or cabanas produces intimate spaces for overwhelmed families. 

The patient rooms are also designed to engage families in patient care. This approach lays the foundation for aftercare, which is critical to long-term recovery. Individual controls allow patients to adjust lighting and temperature, personalizing the environment to increase comfort. The overall layout promotes communication between the patients and staff as well as encourages families to engage in the healing process. HCM gave special attention to creating comfortable, inviting spaces dedicated to caregivers, patients and family members. 



February 22, 2024


Topic Area: Construction


Recent Posts

From Downtime to Data: Rethinking Restroom Reliability in Healthcare

Manufacturers discuss the operational issues plaguing healthcare restrooms and how to shift maintenance from reactive to resilient.


LeChase Building Four-Story Addition to UHS Delaware Valley Hospital

It will consolidate services into a state-of-the-art Medical Neighborhood.


AdventHealth Sebring Breaks Ground on Expansion Project

Construction is scheduled to begin in March and is anticipated to be completed in Fall 2027.


Regulations Take the Lead in Healthcare Restroom Design

Infection-control guidance and water management standards drive earlier planning, smarter fixtures and more resilient restroom environments.


AHN Allegheny Valley Hospital Opens Expanded Inpatient Rehabilitation Unit

Construction began in July 2025 and included 12 new inpatient rehabilitation beds, bringing the unit’s total to 29.


 
 


FREE Newsletter Signup Form

News & Updates | Webcast Alerts
Building Technologies | & More!

 
 
 


All fields are required. This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

 
 
 
 

Healthcare Facilities Today membership includes free email newsletters from our facility-industry brands.

Facebook   Twitter   LinkedIn   Posts

Copyright © 2023 TradePress. All rights reserved.