Hospital Design Puts Patient Needs First

To maintain a setting that is better for patients with autism, the design emphasizes a lack of visual clutter


The design of healthcare facilities continues its evolution with patient comfort in mind in addition to physical health. Increasingly, new-generation facilities are planned to accommodate the emotional needs of a range of patients and their families.

For example, in Charleston, S.C., a new 625,000-square-foot women’s and children’s care facility is officially open at the Medical University of South Carolina (MUSC). The Shawn Jenkins Children’s Hospital & Pearl Tourville Women’s Pavilion encompasses 10 stories and has a patient capacity of 250, according to Healthcare Operations+Construction. The tower stands adjacent to an existing four-story medical podium.

The MUSC campus specializes in solutions for rare healthcare issues that can be especially sensitive for female patients to discuss openly with their caregivers. These include high-risk pregnancies as well as labor and delivery care. The facility prides itself on being an autism-friendly hospital.

The design of the project entails a staff terrace and as a Child Life play area that makes children feel more at home and less as if they are in a healthcare facility. To maintain a setting that is better for patients with autism, the design emphasizes a lack of visual clutter, as well as lighting schemes meant to be illuminating but not upsetting to those who are especially sensitive, such as those on the autism spectrum. The schematic also removes as much audible noise as possible so as not to upset patients.

Click here to read the article.



January 21, 2021


Topic Area: Construction


Recent Posts

The Fatal Flaws in Active Shooter Response in Healthcare Facilities

The most effective solutions to workplace violence are sophisticated emergency response planning and master level training for all employees.


Utah Hospital Outage Highlights Backup Power and Resiliency Challenges

The hospital went without power for nearly two hours.


Ground Broken on New North Dakota State Hospital

The 300,000-square-foot facility in Jamestown will provide 140 beds in a modern, trauma-informed care environment.


Form Your Pit Crew: Key Takeaways From the 2025 Healthcare Innovations Conference

The Healthcare Innovations Conference brought together healthcare facility managers from across the country to collaborate on industry issues.


Glens Falls Hospital Caught Up in Oracle Health Data Breach

As of November 2, 2024, Glens Falls Hospital no longer uses Oracle Health/Cerner as its electronic health record vendor.


 
 


FREE Newsletter Signup Form

News & Updates | Webcast Alerts
Building Technologies | & More!

 
 
 


All fields are required. This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.