Howden American fan company offers jet fans and induction fans for parking garage ventilation


Howden American Fan Company, the leading manufacturer of high-quality industrial fans and blowers, announces its new ventilation concept for underground parking garages, which includes two alternative options – the Jet Thrust Fan and the Induction Thrust Fan. The new system lowers the required parking garage height by about 4 feet, reducing excavation and cement costs and lowering overall construction costs.

The Howden system replaces traditional ducted garage ventilation distribution with a number of small ceiling-mounted fans. The Jet Thrust Fan option features small ceiling-mounted UL-certified units, with silencers, hangers, and deflectors. The Jet Thrust Fan can be equipped with optional reversible flow capability for emergency smoke ventilation and access for fire personnel. The alternative Induction Thrust Fan option features small ceiling-mounted UL-705 certified units with an even smaller height profile than the Jet Thrust Fan. Induction Thrust fans are used for ventilation, and as noted, reduce construction costs and require lower building heights.

Howden supplies axial or centrifugal fans, placed in the optimum location to distribute the airflow to all areas of the parking garage, ensuring removal of any stagnant air. The Jet Thrust/ Induction Thrust fans are controlled to detect pollution and activate only as needed to meet required pollution thresholds. The system can be zoned, so all fans do not have to operate at the same time.

“Parking garage fan systems are one of the most cost effective ways to ventilate, both in terms of installation cost and long term running costs,” said Rae Jane Araujo, Technical Sales Manager, Howden Industrial Fan Group. “In addition, minimizing clearances between ceiling height and cars and trucks can really reduce construction costs.”

 



May 24, 2016


Topic Area: Press Release


Recent Posts

Gaps in Nurses' Environmental Cleaning Knowledge Grow Amid Rising EVS Pressures

Environmental cleaning is crucial in preventing HAIs, but when the responsibility falls to those outside of EVS teams, problems arise. 


Ground Broken on the Southern Nevada Forensic Facility

Construction on the new secure forensic psychiatric hospital is expected to be completed in 2029.


Jackson Hospital Falls Victim to Third-Party Cybersecurity Incident

Jackson Hospital has no evidence that any personal information has been or will be used for identity theft as a direct result of this incident.


Making Healthcare Lighting Retrofits Work

Effective operational planning determines whether a retrofit project improves a facility or creates new problems.


Stadium Design is Reshaping Healthcare Facilities

Hospitals are turning to the sports industry for innovative ways to support healing and improve the patient experience.


 
 


FREE Newsletter Signup Form

News & Updates | Webcast Alerts
Building Technologies | & More!

 
 
 


All fields are required. This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

 
 
 
 

Healthcare Facilities Today membership includes free email newsletters from our facility-industry brands.

Facebook   Twitter   LinkedIn   Posts

Copyright © 2023 TradePress. All rights reserved.