Johnson Controls Extends VP140 Series of Pressure Independent Control Valves


Johnson Controls announces a new addition to its line of pressure independent valves that deliver stable temperature flow regardless of pressure fluctuations. The new compact VP140 Pressure Independent Control Valves (PICVs) provide a small footprint valve with robust performance.  Its patented cartridge is designed for maximum resistance to dirty water, ensuring performance does not degrade, even in less than ideal water conditions. 

Traditional systems are balanced at full-flow positions; however, under actual conditions, pressure dynamics often result in either too much or not enough flow through the coils, even though the valve position did not change. Compared to a pressure dependent valve, the automatic balancing action of the PICV regulates pressure to reduce temperature fluctuations caused by changing load conditions in other areas (zones) of the building. This reduces pumping requirements and lowers demand on the heating or cooling system.

Including a PICV also helps simplify specification. Valves are selected based on the design flow rate of the coil, eliminating the need for sizing based on Cv calculations. PICVs provide the appropriate flow given the load requirement of the coil, which is determined by the actuator position and not the pressure differential seen by the valve. The PICV also reduces installation and upfront equipment costs by enabling the right-sizing of equipment within the HVAC system.

The PICV combines the function of a control valve, pressure balancing valve and regulating valve into a single valve, eliminating the need for intensive system balancing, while providing the right flow, at the right time. As additional zones are added, the system can be commissioned zone-by-zone, reducing lifecycle costs by minimizing re-commissioning expense.

For more information on the VP140 Series of Pressure Independent Control Valves, visit https://www.johnsoncontrols.com/building-automation-and-controls/hvac-controls/valves-and-actuators.

 



September 6, 2019


Topic Area: Press Release


Recent Posts

Cleanliness in Hospitals: Clinical Priority and Community Perception

EVS managers and communities value cleanliness for complementary reasons: managers for safety and compliance, communities for trust and comfort.


Dana-Farber Receives $50M Gift for Planned Cancer Hospital

A $50 million grant from the Yawkey Foundation will support construction of Dana-Farber Cancer Institute’s planned 450,000-square-foot cancer hospital.


Clarinda Regional Health Center Reports Data Security Incident

On or around December 15, 2025, Clarinda learned that certain data within its network may have been accessed without authorization.


Gaps in Nurses' Environmental Cleaning Knowledge Grow Amid Rising EVS Pressures

Environmental cleaning is crucial in preventing HAIs, but when the responsibility falls to those outside of EVS teams, problems arise. 


Ground Broken on the Southern Nevada Forensic Facility

Construction on the new secure forensic psychiatric hospital is expected to be completed in 2029.


 
 


FREE Newsletter Signup Form

News & Updates | Webcast Alerts
Building Technologies | & More!

 
 
 


All fields are required. This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.