Kohler Eases Specifications Through KohlerBIM.com and MasterSpec Software


In an effort to better facilitate specifications for trades professionals, architects and designers, Kohler has launched a new KohlerBIM.com site to house the CAD models for plumbing products in one location, and in a separate initiative has partnered with ARCOM to incorporate product data and customized specifications within the MasterSpec software platform. 

With the launch of KohlerBIM.com, the plumbing brand offers a one-stop-shop for various types of CAD files, including Revit, of their products. The site allows professionals to access and acquire the necessary files in a proficient manner, and in turn ensuring better results in long-term maintenance of the facilities built from these specifications. 

“The use of new tools like CAD and Revit files for building information modeling and MasterSpec’s comprehensive library of specifications has become an important focus for trade professionals. It is crucial that the information they gather for their projects is accurate and done in an efficient manner,” says Elisabeth Sutton, Kohler marketing director. “With the integration of Kohler products into MasterSpec, plus our new KohlerBIM site, we can better help architects and plumbing engineers specify Kohler products quickly and accurately.” 

According to MasterSpec, 90 percent of the top 500 engineering firms and 85 percent of the top 500 architecture firms utilize the service to generate their three-part specifications. Within MasterSpec, Kohler’s commercial faucet, fixture and flush valve product information is included in the commercial toilets, urinal, and lavatory sections.



August 2, 2017


Topic Area: Press Release


Recent Posts

Extreme Weather: The Maintenance-Resilience Link

Extreme heat serves as stress test of the resilience of utility systems that provide power, cooling and life safety functions.


Encompass Health Lower Providence Opens in Pennsylvania

The 50-bed inpatient rehabilitation hospital is the company's 11th location in Pennsylvania.


Intermountain Health Acquires Fairbourne Building for Healthcare Hub and Medical Campus Conversion

Construction on the interior of the building is underway with the city and Intermountain working closely together on the campus.


Cooling Towers at NYC Health + Hospitals/Lincoln Test Positive for Legionella

Hospital among the positive tests at 10 cooling towers in South Bronx.


Prefabricated Wall Panels Accelerate UCF Lake Nona Medical Center Construction

Case study: StoPanel exterior wall systems helped Wal-Mark Contracting meet strict Florida wind-load requirements and complete 136 panels in just 11 days.


 
 


FREE Newsletter Signup Form

News & Updates | Webcast Alerts
Building Technologies | & More!

 
 
 


All fields are required. This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

 
 
 
 

Healthcare Facilities Today membership includes free email newsletters from our facility-industry brands.

Facebook   Twitter   LinkedIn   Posts

Copyright © 2023 TradePress. All rights reserved.