Larson Electronics LLC Releases a Heavy-Duty Battery-Powered Magnetic Signal Light


Industrial lighting leader, Larson Electronics LLC, released a portable magnetic signal light that runs on two 6V DC batteries and has an amber lens. This LED beacon provides visual warning when power is unavailable and includes two 200-pound magnets for portable mounting on flat metallic surfaces.

The HDFL-BP-A-M is a portable magnetic amber LED beacon that runs on two standard 6-volt DC spring terminal lantern batteries. This strobing beacon is an ideal notification light for warehouse equipment, farming operations, vehicles and construction sites, providing operators with a signal light in times when power is unavailable. This magnetic beacon produces illumination that can be seen from an impressive mile away and flashes 65 times per minute. The beacon is amber in color and operated via a simple rocker switch.

This LED beacon is 100% portable, easily mounted with two, 200-pound magnets located along the bottom of the light. The magnetic mounting allows the beacon to be installed and quickly removed from any flat magnetic surface, making it ideal for towing, trailers, roadside emergencies, and other industrial applications that may suddenly need a source of powerful illumination.

“This LED beacon is the perfect device to add to your toolbox in case of an emergency lighting situation,” said Rob Bresnahan, CEO of Larson Electronics LLC. “It weighs just 2 pounds and is less than a foot tall so it can be stored away easily. Whenever it’s needed you just simply take it out, turn it on and mount it. No messing with wires or complicated mounting brackets.”

About Larson Electronics LLC: Larson Electronics LLC



August 20, 2018


Topic Area: Press Release


Recent Posts

Contaminants Under Foot: A Closer Look at Patient Room Floors

So-called dust bunnies on hospital room floors contain dust particles that turn out to be the major source of the bacteria humans breathe.


Power Outages Largely Driven by Extreme Weather Events

Almost half of power outages in the United States were caused by extreme weather events.


Nemours Children's Health Opens New Moseley Foundation Institute Hospital


Code Compliance Isn't Enough for Healthcare Resilience

Intensifying climate risks are pushing hospitals to think beyond code requirements and toward long-term resilience.


Ribbon Cutting Marks First Phase Completion for New Montefiore Einstein Facility

The second phase is expected to be completed in the second half of 2027.


 
 


FREE Newsletter Signup Form

News & Updates | Webcast Alerts
Building Technologies | & More!

 
 
 


All fields are required. This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.