Legrand Provides Six Ways to Reduce Energy Usage in Commercial Facilities


Reducing energy usage has long been a focus for building facility and operations managers.  Not only are costs and meeting codes a concern, but so is measuring up to the social expectations of being a good corporate citizen.

Many energy saving technologies come with large monetary outlays and often require longer term planning. But there are also a host of solutions that can quickly, easily and inexpensively deliver significant savings.

Room/Area Occupancy Sensors

Many areas within your facility might not be occupied for extended periods during the work day such as conference rooms, restrooms, and storage rooms. Now add all those areas that are unoccupied after hours. The energy costs can really add up. Room and area occupancy sensors can turn off the juice when it’s simply not needed.  

If budgeting is a challenge, start small by installing some occupancy sensors in the least occupied spaces and then slowly expand coverage. The additions will ultimately pay for themselves many times over.

Wall Switch Dimmers

Lighting dimmers are an often overlooked, yet very effective energy savers, and dimmers combined with timers or occupancy sensors are very effective energy reducers.  One common “best practice” is to set the starting lighting level at 50%.  If more light is needed, it can be turned up. 

Not only do dimmers save money by reducing power bulb, but they can also extend bulb life. Incandescent and halogen bulbs have been shown to last up to 20 times longer when used with a dimmer. That’s money in your pocket. And when used with LED bulbs, the savings can be greater still.

Plug Load Controls

Essentially a high-tech, large-scale, more customizable version of the occupancy-sensing power strip, plug load controllable and wirelessreceptacle controls help eliminate vampire power draw throughout an entire building.

Products like our Wireless Receptacle Control products leverage lighting control sensors for improved ROI. Plug load controls provide an estimated 10% energy savings and meet new energy codes which require that 50% of all 15 & 20A, 125V receptacles be controlled automatically in areas such as private offices, open offices, modular partitions, and computer classrooms. 

Digital Daylight Controls

Why do we waste energy in spaces that are already well lit by natural light?  The answer is: We don’t have to!  There are a host of  daylighting controls that automatically reduce electric light levels based on the amount of natural light available through windows or skylights.  These devices, such as dimmers and photosensors, can reduce energy consumption by as much as 40%.

Shading Systems

Shades can reduce heat, glare and energy cost. While we usually enjoy having natural sunlight coming through our windows, the heat from the sun can affect your HVAC load. Easily manage natural light for energy savings with automatic motorized shades, which can be programmed to raise and lower to keep lighting and temperature at optimum levels.

Occupancy-Sensing (OS) Power Strips

Power strips draw electricity whether or not the devices they serve are turned on.  So, even if equipment is in use 8-10 hours per day, the power strips draw energy 24 hours per day.  When you consider that many of the devices that are plugged into the power strips are left on unnecessarily, you realize how much energy is wasted. 

Occupancy-sensing power strips have a motion sensor that senses when a room or area is no longer in use and automatically shuts off power to individual outlets. Because there may be devices that must receive power at all times, many power strips offer a number of “live” outlets that receive power 24/7. OS power strips give an added level of energy control for non-critical devices that don’t need power during unoccupied periods.

For more information, visit www.legrand.us.



February 22, 2017


Topic Area: Press Release


Recent Posts

Reframing the Construction Manager as a Community Manager

Managers must work with patients, community residents and other interested parties to ensure a smooth, successful construction projects


Health First Celebrates 'Topping Off' Ceremony for New Cape Canaveral Hospital Campus

Construction is slated to finish by the end of 2026 or early 2027.


The University of Hawai'i Cancer Center Caught Up in Cyberattack

Investigations are still ongoing to assess other sensitive information that may have been impacted.


Mature Dry Surface Biofilm Presents a Problem for Candida Auris

Multiple methods are described in the literature, but no consensus has been reached for disinfection efficacy tests against biofilms.


Sutter Health's Arden Care Center Officially Opens

With an adaptive reuse of an underutilized office building, the 70,000 square-foot facility was renovated to meet current healthcare standards.


 
 


FREE Newsletter Signup Form

News & Updates | Webcast Alerts
Building Technologies | & More!

 
 
 


All fields are required. This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

 
 
 
 

Healthcare Facilities Today membership includes free email newsletters from our facility-industry brands.

Facebook   Twitter   LinkedIn   Posts

Copyright © 2023 TradePress. All rights reserved.