Leviton First to Announce UL Listing for 250-Volt Tamper-Resistant Receptacles


Leviton recently announced their UL listing of heavy-duty industrial specification grade 15-amp and 20-amp 250-volt tamper-resistant single receptacles. They provide a solution that meets the requirements of Article 406.12 of the National Electric Code, as well as meeting Canadian safety requirements.

 

Article 406.12 in the 2017 National Electric Code expanded the locations requiring tamper-resistant receptacles to include:

·         Preschools and elementary education facilities

·         Dormitories

·         Business offices, corridors, and waiting rooms

·         Medical and dental offices and outpatient facilities

·         Places of waiting in transportation areas

·         Gymnasiums

·         Skating rinks

·         Auditoriums

A common application for this product is providing power to air conditioning units located in the various facilities listed above. Leviton is also offering weather-resistant versions of these receptacles that comply with the requirements of NEC Article 406.9 for damp and wet locations. 

“We’re committed to providing timely and safe solutions to our customers, so we made it a priority to develop a product that met this new NEC requirement,” said Tony Pulsonetti, senior manager of commercial products for Leviton’s Commercial & Industrial business division. “At Leviton, we are the go-to brand for customers when new codes or requirements call for changes in buildings and homes.”

For additional product information, visit www.leviton.com/receptaclegrades.



November 12, 2018


Topic Area: Press Release


Recent Posts

Spaces That Support: Patient-Centered Design for Modern Reproductive Health

Modern facilities must integrate highly specialized laboratories with thoughtful, patient-centered spaces that prioritize privacy, comfort and emotional well-being.


Modernization of Buildings Require Collaboration Across All Disciplines

Retrofitting outdated facilities requires consulting all departments on how to best improve operations.


Children's Health Announces Plans for RedBird Specialty Center in Texas

The system expects to welcome its first patients in December 2027.


How Can Healthcare Facilities Use Efficiency to Drive Climate and Health Goals?

Keith Edgerton discusses how the Health Care Energy & Water Efficiency Checklist helps healthcare connect operational savings with their mission to protect people and the planet.


El Camino Health Rehabilitation Hospital Officially Tops Out

This new 64,000-square-foot, 52-bed inpatient facility in Sunnyvale, California, will enhance rehabilitation services in Santa Clara County.


 
 


FREE Newsletter Signup Form

News & Updates | Webcast Alerts
Building Technologies | & More!

 
 
 


All fields are required. This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.