Low Flow Diffuser Fills Void, Helping Industry Meet Changing Codes


A national leader in airflow codes, Washington has called for diffusers used in the state to use low air volumes. But there was a problem: No diffuser satisfied both the industry code requirements and the functional and aesthetic needs of engineers, architects and building owners. Titus, a world leader in air distribution, fills that void with TJD, a standard OMNI diffuser designed specifically to address low air volume codes.

While most air outlets typically work at 100 CFMs, the patent pending TJD performs at 20 to 50 CFMs and throws air at 50 feet per minute up to nine feet from the diffuser. The high mixing increases the discharge isovel and its throw, providing uniform temperatures and equally distributed outside air throughout the space.

TJD also earned a perfect 100 score during ASHRAE’s extremely low air volume Air Diffusion Performance Index (ADPI) testing, proving the product’s ability to satisfy functional and comfort requirements. That means engineers can both meet the latest codes and reduce air volume dependence, and building owners can achieve noticeable energy and operations savings while ensuring occupant comfort.

“Forward-thinking customers can get ahead by using a solution specifically designed to meet industry codes and achieve functional, aesthetic and comfort needs,” said Mark Costello, product manager of grilles, registers and diffusers, Titus.

Best suited in areas where low airflow codes are applicable, TJD is ideal for smaller spaces with low equipment and external loads. It is also highly suitable for occupied spaces, as TJD incorporates Titus’s popular architectural plaque diffuser, giving it a polished look.

TJD’s release comes on the heels of Titus’s 2017 AHR Innovation Award win in the Ventilation category for its Helios diffuser, the industry’s first ambient light-powered digital diffuser. For more information on TJD, Helios and other air management products from Titus, please visit titus-hvac.com.



June 1, 2017


Topic Area: Press Release


Recent Posts

Mature Dry Surface Biofilm Presents a Problem for Candida Auris

Multiple methods are described in the literature, but no consensus has been reached for disinfection efficacy tests against biofilms.


Sutter Health's Arden Care Center Officially Opens

With an adaptive reuse of an underutilized office building, the 70,000 square-foot facility was renovated to meet current healthcare standards.


Insight Hospital and Medical Center Falls to Data Breach

The investigation determined that an unauthorized individual accessed the network between August 22, 2025, and September 11, 2025.


The High Cost of Healthcare Violence

As workplace violence increases, healthcare facilities face mounting financial and operational disruptions- prompting legislative action.


EVS Teams Can Improve Patient Experience in Emergency Departments

A report confirmed that cleanliness of the ED was the third most impactful element on patient experience surveys.


 
 


FREE Newsletter Signup Form

News & Updates | Webcast Alerts
Building Technologies | & More!

 
 
 


All fields are required. This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.