Luxaire expands its Eclipse rooftop replacement solution with a new packaged heat pump that features advanced control technology


The Luxaire brand of Johnson Controls is expanding its Eclipse rooftop replacement solution with the addition of a new heat pump. Available in 3- to 8.5-ton capacities, the heat pump saves contractors time with an exact-fit footprint and advanced control technology that contribute to easy installation, setup and maintenance.

The exact-fit replacement design matches heat pumps and all units in the Luxaire rooftop replacement solution to other manufacturers’ units and reduces installation time, cost and complexity by eliminating the need for a curb adapter.

Simplicity Smart Equipment (SE) Controls also contribute to system setup, optimization and monitoring that is far easier than older, electromechanical controls. This next generation control system is a standard feature on all Eclipse gas/electric, electric/electric and heat pump packaged and commercial split system configurations.

The system’s advanced design also offers an optional Mobile Access Portal (MAP) Gateway that provides access to the SE control system using a smartphone, tablet, laptop or remote PC. An optional Fault Detection and Diagnostics (FDD) saves contractors time by providing detailed alerts if issues arise, and quick ship options improve product availability. 

Additional features of the new heat pumps include adjustable defrost and three heat capacities, two cabinet heights and footprint sizes and a choice of cooling or electric heat configurations.     

For more information, visit www.Luxaire.com/Eclipse.



June 1, 2016


Topic Area: Press Release


Recent Posts

Cleanliness in Hospitals: Clinical Priority and Community Perception

EVS managers and communities value cleanliness for complementary reasons: managers for safety and compliance, communities for trust and comfort.


Dana-Farber Receives $50M Gift for Planned Cancer Hospital

A $50 million grant from the Yawkey Foundation will support construction of Dana-Farber Cancer Institute’s planned 450,000-square-foot cancer hospital.


Clarinda Regional Health Center Reports Data Security Incident

On or around December 15, 2025, Clarinda learned that certain data within its network may have been accessed without authorization.


Gaps in Nurses' Environmental Cleaning Knowledge Grow Amid Rising EVS Pressures

Environmental cleaning is crucial in preventing HAIs, but when the responsibility falls to those outside of EVS teams, problems arise. 


Ground Broken on the Southern Nevada Forensic Facility

Construction on the new secure forensic psychiatric hospital is expected to be completed in 2029.


 
 


FREE Newsletter Signup Form

News & Updates | Webcast Alerts
Building Technologies | & More!

 
 
 


All fields are required. This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.