Mitsubishi Electric Introduces Diamond System Builder Software




SUWANEE, Ga. – Mitsubishi Electric US Cooling & Heating Division, America’s No. 1 selling brand of ductless cooling and heating technology, has launched its Diamond System Builder layout tool for engineers. Diamond System Builder is an equipment selection software tool that makes it quicker and easier for engineers to design Mitsubishi Electric CITY MULTI® Variable Refrigerant Flow (VRF) zoning and split-ductless systems.
 
The new Diamond System Builder replaces the Design Tool software for current- and future-generation equipment. It includes built-in tests to enable engineers to check that line lengths, maximum connected capacities, component selection and control scheme are within the system requirements. The tool can also generate an AutoCAD schematic with wiring and piping diagrams, streamlining the installation process. Additionally, the software can provide a system summary in a spreadsheet, simplifying job quoting and equipment list tracking.
 
“Our goal is to make our products as easy and efficient to use as possible, from design and specification, to installation and operation,” said Mike Smith, senior marketing manager - commercial products, Mitsubishi Electric US Cooling & Heating Division. “The new Diamond System Builder includes upgrades that will improve the experience engineers have specifying our products.”
 
Diamond System Builder’s key features include:

    Increased support of piping length allowances and relative height differential checking.
    Improved control view layout with streamlined remote controller selection.
    Support for selection, with corrected capacities, of M-, S- and P-Series systems, including AutoCAD output.
    Future software maintenance and updating via remote database syncing strategy, minimizing errors from outdated information and reducing frequency of full software reinstallation for updates.
    Integration of the startup checklist reporting process for extended warranty with significant reduction of required inputs.
    Enhanced schedule output functionality for specifying engineers.

The Diamond System Builder software is available through your Area Sales Manager. To learn more about Mitsubishi Electric US Cooling & Heating Division, visit www.mehvac.com.



August 20, 2013


Topic Area: Press Release


Recent Posts

Frederick Health Hospital Faces 5 Lawsuits Following Ransomware Attack

The lawsuits accuse FHH of inadequate cybersecurity, poor breach notification and failing to protect patients from identity theft risks.


Arkansas Methodist Medical Center and Baptist Memorial Health Care to Merge

They have signed a non-binding letter of intent to complete a shared mission agreement to merge the two organizations.


Ground Broken on Intermountain Saratoga Springs Multi-Specialty Clinic

The clinic is scheduled to open and start seeing patients in the fall of 2026.


Electrical Fire Tests Resilience of Massachusetts Hospital

Signature Healthcare Brockton Hospital used opportunity to renovate key systems and components and expand facility operations.


Bomb Threat Alleged at Illinois Hospital

The alleged suspect was taken into police custody, and the threat was determined to be unfounded.


 
 


FREE Newsletter Signup Form

News & Updates | Webcast Alerts
Building Technologies | & More!

 
 
 


All fields are required. This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.