Mitsubishi Electric Introduces Diamond System Builder Software




SUWANEE, Ga. – Mitsubishi Electric US Cooling & Heating Division, America’s No. 1 selling brand of ductless cooling and heating technology, has launched its Diamond System Builder layout tool for engineers. Diamond System Builder is an equipment selection software tool that makes it quicker and easier for engineers to design Mitsubishi Electric CITY MULTI® Variable Refrigerant Flow (VRF) zoning and split-ductless systems.
 
The new Diamond System Builder replaces the Design Tool software for current- and future-generation equipment. It includes built-in tests to enable engineers to check that line lengths, maximum connected capacities, component selection and control scheme are within the system requirements. The tool can also generate an AutoCAD schematic with wiring and piping diagrams, streamlining the installation process. Additionally, the software can provide a system summary in a spreadsheet, simplifying job quoting and equipment list tracking.
 
“Our goal is to make our products as easy and efficient to use as possible, from design and specification, to installation and operation,” said Mike Smith, senior marketing manager - commercial products, Mitsubishi Electric US Cooling & Heating Division. “The new Diamond System Builder includes upgrades that will improve the experience engineers have specifying our products.”
 
Diamond System Builder’s key features include:

    Increased support of piping length allowances and relative height differential checking.
    Improved control view layout with streamlined remote controller selection.
    Support for selection, with corrected capacities, of M-, S- and P-Series systems, including AutoCAD output.
    Future software maintenance and updating via remote database syncing strategy, minimizing errors from outdated information and reducing frequency of full software reinstallation for updates.
    Integration of the startup checklist reporting process for extended warranty with significant reduction of required inputs.
    Enhanced schedule output functionality for specifying engineers.

The Diamond System Builder software is available through your Area Sales Manager. To learn more about Mitsubishi Electric US Cooling & Heating Division, visit www.mehvac.com.



August 20, 2013


Topic Area: Press Release


Recent Posts

Making Multi-Site Lighting Upgrades Work

Success requires a program structure that connects audits, financial analysis, rebate administration, procurement, scheduling and closeout documentation.


Designing a Positive Care Destination for Children

The new Mary Bridge Children’s Hospital reimagines the healthcare experience to create an environment that feels welcoming from arrival to discharge.


Blackbird Health Opens 10th Clinic in Pennsylvania

The Bala Cynwyd clinic represents Blackbird Health's 13th location overall.


Healthcare Construction Infection Control: Essential CDC Guidelines for Active Facilities

Construction and renovations happen, but that doesn’t mean infection prevention can take a backseat. The CDC has some recommendations for maintaining best practices during construction.


Protecting the Most Vulnerable: Inside the NICU

SSM Health St. Mary’s Hospital leaders share how maintaining power, air quality and essential systems helps protect patients during their most vulnerable moments.


 
 


FREE Newsletter Signup Form

News & Updates | Webcast Alerts
Building Technologies | & More!

 
 
 


All fields are required. This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.