Modine's enhanced geothermal heat pumps


Modine’s geothermal systems now offer an enhanced control platform.  The robust controller has served the manufacturer’s school systems and commercial ventilation product lines for more than a decade. 

All Modine geothermal systems – from 1.5 tons to 12 tons – now feature the proven Modine Control System, providing quick start-up, easy safety device wiring, multiple inputs and outputs, BACnet IP/Eth, BACnet MSTP and Lon capability and easy troubleshooting. 

The ENERGY STAR-rated residential and light commercial geothermal product line includes water-to-water, water-to-air, water-to-air/water combination, and split condensing/air-handling systems; all use R410A refrigerant.

Standard features include ECM fan motors, dual speed scroll compressors, MERV 13 air filters, oversized heat exchangers and a 10-year limited warranty.

• Water-to-water residential and light commercial models are available in reversible and non-reversible sizes from 2- to 12-ton sizes. 

• Water-to-air models range in size from 1.5- to 6-ton units in both vertical and horizontal configurations. Compact commercial systems are also available for water source or geothermal applications.  

• Water-to-air/water combination units provide forced air heating and cooling and also the ability to provide heat for radiant-heated floors, domestic hot water, pools/spas and snow melting. They are available in 3- to 6-tons in both vertical and horizontal configuration. 

• Split system/air-handling systems, from 2- to 6-tons, are well-suited for new and retrofit applications. 

Modine offers a number of options including a desuperheater which provides supplemental domestic hot water; cupronickel heat exchangers for applications where harsh water conditions exist; tin-plated coils to eliminate formicary corrosion; and electric heating for auxiliary back-up heat.  

 



August 31, 2015


Topic Area: Press Release


Recent Posts

CRAB Alert: The EVS Role in Preventing Infection

CRAB is a Gram-negative bacterium that causes bloodstream infections, ventilator-associated pneumonia, surgical wound infections and meningitis in hospitalized patients.


Why Hospital Waiting Rooms Aren't Going Away

Despite advances in technology, thoughtfully designed reception spaces continue to evolve.


Ground Broken on Mount Sinai Tisch Cancer Hospital

The hospital is aiming to open in 2030 on Mount Sinai’s Upper East Side campus.


Design, Compartmentation, Training: How Defend-in-Place Strategies Can Protect Patients

Effective defend-in-place strategies depend on compartmentation, fire-rated assemblies and ongoing staff training to protect patients who cannot quickly evacuate.


Milestone Marked with Topping Out Ceremony for BayCare Hospital Manatee

Construction remains on schedule, with crews continuing work on interior spaces, infrastructure and clinical areas throughout the facility.


 
 


FREE Newsletter Signup Form

News & Updates | Webcast Alerts
Building Technologies | & More!

 
 
 


All fields are required. This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.