New energy savings data for refrigerator/freezer coil cleaning


New energy savings data was disclosed on Feb. 2 in an educational presentation at the RFMA (Restaurant Facility Managers Association) Convention in San Diego, CA.  It was generated by a consultant to the respected Food Service Technology Center and is believed by us to have broad applicability to all types of plug-in cooling appliances. Here it is:

Condenser coil cleaning was performed on a 6 year old, 2-door glass merchandiser. Such cleaning produced a 47% reduction in both electric usage and cost (or about $625 per UNIT). [A non-cleaned unit consumed 24.19 kWh/yr at a cost of $1325/yr. The cleaned unit needed 12.76 kWh/yr and cost only $700/yr to run.]*

An excellent description of the possible, major repair costs you may face if you neglect this cleaning has also just been published: http://bit.ly/173veNR .

Finally, we have developed the unique COILPOD dust hood allowing this cleaning to be done in a "green"/no-mess manner with compressed air and vacuum.  Here's a link to our demo video: https://www.youtube.com/watch?v=PPKQFq4vqzA.  Our site coilpod.com has more information plus an online store for purchase of bag(s). I'd be happy to answer any questions that you may have on the general coil cleaning topic or our unique cleaning aid. 

 



February 23, 2015


Topic Area: Press Release


Recent Posts

How Efficiency Checklists Help Hospitals Save Energy, Water and Money

Keith Edgerton explains how a simple, systematic tool can help healthcare facilities identify savings, support sustainability goals and reinvest in long-term decarbonization.


Designing with Heart: Seen Health Center Blends Cultural Warmth and Clinical Care

Case study: The Alhambra-based facility uses Wilsonart Woodgrains to create a space where comfort, tradition and durability come together for an elevated senior care experience.


Rutgers Health and University Hospital Breaks Ground on Campus Expansion

The groundbreaking follows the long-awaited demolition of administrative offices built in the 1970s.


What to Consider When Modernizing Healthcare Facilities

While there has been a call to preserve old buildings, healthcare facilities need to weigh the options of patient care.


Corewell Health Beaumont Troy Hospital to Build New Tower

The tower is expected to be completed in 2030.


 
 


FREE Newsletter Signup Form

News & Updates | Webcast Alerts
Building Technologies | & More!

 
 
 


All fields are required. This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.