New fire ready kitchen hood available from Greenheck


Greenheck’s new Fire Ready Hood, Model GRRS, functions as a standard ventilation range hood with the added capacity to suppress stove-top fires, addressing the challenge of protecting residential-style appliances used in commercial settings. 

Designed for use over a standard 30 or 36-inch residential range, the Fire Ready Hood incorporates a UL300A Listed self-contained, commercial-style automatic fire suppression system. The hood’s exhaust fan can be either manually operated with the face-mounted dial or automatically operated based on the hood temperature that is monitored by an onboard controller. If the hood temperature is elevated beyond normal operation, the controller will disable the appliance via the factory-supplied appliance disconnect. An audible alarm and dry contact will be engaged to alert occupants and building alarms of elevated temperatures. If temperatures continue to rise beyond the rating of the system’s fusible link, Amerex 660 agent will be released through four nozzles directed at the appliance and one nozzle into the exhaust duct. The Fire Ready Hood is ideal for applications where residential-style appliances are used for noncommercial cooking, such as dorms, office lunchrooms, churches, fire stations and military housing. 

Greenheck is the worldwide leader in manufacturing and distributing air movement and control equipment. 

For more information about Greenheck products, visit www.greenheck.com or contact Greenheck, P.O. Box 410, Schofield, WI 54476-0410, (715) 359-6171, FAX (715) 355-2399.

 



February 4, 2015


Topic Area: Press Release


Recent Posts

Extreme Weather: The Maintenance-Resilience Link

Extreme heat serves as stress test of the resilience of utility systems that provide power, cooling and life safety functions.


Encompass Health Lower Providence Opens in Pennsylvania

The 50-bed inpatient rehabilitation hospital is the company's 11th location in Pennsylvania.


Intermountain Health Acquires Fairbourne Building for Healthcare Hub and Medical Campus Conversion

Construction on the interior of the building is underway with the city and Intermountain working closely together on the campus.


Cooling Towers at NYC Health + Hospitals/Lincoln Test Positive for Legionella

Hospital among the positive tests at 10 cooling towers in South Bronx.


Prefabricated Wall Panels Accelerate UCF Lake Nona Medical Center Construction

Case study: StoPanel exterior wall systems helped Wal-Mark Contracting meet strict Florida wind-load requirements and complete 136 panels in just 11 days.


 
 


FREE Newsletter Signup Form

News & Updates | Webcast Alerts
Building Technologies | & More!

 
 
 


All fields are required. This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.