New guide to designing HVAC systems for 21st century natatoriums available from Desert Aire


Desert Aire, a Milwaukee-based manufacturer of commercial and industrial humidity and climate control systems, has published a new guide that provides owners, mechanical contractors and engineers with a valuable resource for designing and retrofitting the HVAC systems of indoor pool facilities, natatoriums, aquatic centers and indoor water parks.

“A Guide to an Integrated HVAC System Design for the 21st Century Natatorium” is a 24-page, 4-color publication that reviews pool room design considerations including recent breakthroughs in understanding the complexities of maintaining the indoor air quality of an indoor pool facility. The Guide describes how to overcome challenges in existing HVAC system designs as well as new construction by taking an integrated, sustainable approach to creating the best indoor pool facilities for all stakeholders. 

The integrated approach helps engineers and other planners achieve 21st Century design goals of protecting the health of swimmers, divers, coaches and spectators; promoting the long-term structural integrity of the building and supporting systems; and conserving energy, water and water treatment resources.

The Guide is available for download as a PDF document at desert-aire.com. To receive a printed copy of the Guide, email sales@desert-aire.com.

 



November 4, 2015


Topic Area: Press Release


Recent Posts

IAQ and Infection Mitigation: Plans Into Actions

To support quality patient care and ensure compliance, managers must stay ahead of environmental and IAQ risks.


Case Study: How NYU Langone Rebuilt for Resilience After Superstorm Sandy

Although the damage was severe, it provided a valuable opportunity for NYU Langone to assess structural vulnerabilities and increase facility resilience.


Dayton Children's Hospital Announces New Rehabilitative Services Building

The new location will feature convenient surface parking, outdoor space to aid in healing and a single-level layout.


The Debate on Laundering Microfibers in Healthcare

Should microfibers be single-use or reusable? Researchers have opinions on both.


Construction Begins for New Cancer Center at OhioHealth's Administrative Campus

The project’s completion date is estimated for late 2028.


 
 


FREE Newsletter Signup Form

News & Updates | Webcast Alerts
Building Technologies | & More!

 
 
 


All fields are required. This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.